![Cisco 7201 Installation And Configuration Manual Download Page 58](http://html.mh-extra.com/html/cisco/7201/7201_installation-and-configuration-manual_66539058.webp)
2-28
Cisco 7201 Installation and Configuration Guide
OL-11364-04
Chapter 2 Installing the Cisco 7201 Router
Connecting Power
Figure 2-24
Stripping the DC-Input Power Ground Wire
Step 3
If your ground wire is insulated, use a wire stripping tool to strip the 18-gauge wire, (or 16-gauge, but
not smaller than the supply conductor) ground wire to 0.5 inch (12.7 mm) + 0.02 inch (0.5 mm) as shown
in
Figure 2-24
.
Step 4
Slide the open end of the ground lug over the exposed area of the 18-gauge wire.
Step 5
Use a crimping tool to crimp each ground wire to a ground lug.
Figure 2-25
Placing the Ground Lugs, Star Washers, and Nut
Step 6
Place the ground lugs, star washers, and nut on the grounding stud in this order:
a.
Star washer
b.
Ground lug
c.
Star washer
d.
Ground lug
e.
Nut
Step 7
Tighten the nut to complete the installation.
1
0.5 inch (12.7 mm) + 0.02 inch (0.5 mm)
57019
1
PWR
SLO
T 2
B
A
170970