Install the stabilizers before mounting or servicing the switch in the rack
(if the rack is provided with stabilizing devices).
•
The equipment rack is properly ventilated.
–
Install the chassis in an enclosed rack only if it has adequate ventilation
or an exhaust fan; use an open rack whenever possible.
–
Ensure that the ambient temperature of the rack environment does not
exceed a maximum temperature of 104
°
F (40
°
C). Note that if the switch
is installed in a closed or multiunit rack assembly, the ambient operating
temperature of the rack environment might be higher than the ambient
room temperature.
–
Note that a ventilation system in a closed rack that is too powerful might
also prevent cooling by creating negative pressure around the chassis and
redirecting the air away from the chassis intake vent. If necessary,
operate the chassis with the rack open.
–
To prevent airflow restriction, allow at least 3 inches (7.6 cm) of
clearance around the ventilation openings on the sides of the chassis.
–
Use baffles correctly to assist in cooling the chassis.
–
Note that equipment near the bottom of a rack may generate excessive
heat that is drawn upward and into the intake ports of equipment above,
leading to overtemperature conditions in the chassis at or near the top of
the rack.
–
Consider the equipment and cabling that is already installed in the rack.
Ensure that cables from other equipment will not obstruct the airflow
through the chassis or impair access to the power supplies or switching
modules. Route cables away from field-replaceable components to avoid
disconnecting cables unnecessarily for equipment maintenance or
upgrades.
–
Allow at least 3 to 4 feet (91.4 to 121.9 cm) of clearance behind the rack
for maintenance and removal of switch assemblies. If the rack is mobile,
you can push it back within 1 foot (30.45 cm) of a wall or cabinet for
normal operation and pull it out when necessary for maintenance.
Summary of Contents for 4908G-L3 - Catalyst Switch
Page 4: ......
Page 17: ...xvii Catalyst 4900 Series Switch Installation Guide 78 18039 02 Preface ...
Page 18: ...Preface xviii Catalyst 4900 Series Switch Installation Guide 78 18039 02 ...
Page 19: ...xix Catalyst 4900 Series Switch Installation Guide 78 18039 02 Preface ...
Page 20: ...Preface xx Catalyst 4900 Series Switch Installation Guide 78 18039 02 ...
Page 22: ...Preface xxii Catalyst 4900 Series Switch Installation Guide 78 18039 02 ...