13
Catalyst 3560-C and 2960-C Switch Getting Started Guide
OL-23802-02
Catalyst 3560-C and 2960-C Switch Getting Started Guide
•
Airflow around the switch and through the vents must be unrestricted. We
strongly recommend that you allow at least 3 in. (7.6 cm) of clearance from
the left, right, and top sides of the switch to avoid any flow blockage. If you
are installing the switch in a rack, allow at least 1.75 in. (4 cm) of empty rack
space above each switch.
•
When placing the switch on a flat horizontal surface, we strongly recommend
that you attach the rubber feet to the switch.
•
For 10/100/1000 fixed ports, cable lengths from the switch to connected
devices can be up to 328 feet (100 meters).
•
For cable lengths for small form-factor pluggable
(SFP)-module connections,
see the hardware installation guide on Cisco.com and the module
documentation.
Installation Warning Statements
This section includes the basic installation warning statements. Translations of
these warning statements appear in the
Regulatory Compliance and Safety
Information for the Catalyst 3560-C and 2960-C Switches
document on
Cisco.com.
Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must
take special precautions to ensure that the system remains stable. The
following guidelines are provided to ensure your safety:
This unit should be mounted at the bottom of the rack if it is the only unit in the
rack.
When mounting this unit in a partially filled rack, load the rack from the bottom
to the top with the heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before
mounting or servicing the unit in the rack.
Statement 1006
Warning
Class 1 laser product.
Statement 1008