3-2
P/N 13772-005
Section 3
Cirrus Design
Emergency Procedures
SR22T
Turbine Inlet Temperature High ....................................................27
EGT, TIT or CHT Temperature Sensor Failure.............................28
Propeller System Emergencies........................................................29
Engine Speed High .......................................................................29
Propeller Governor Failure............................................................30
Fuel System Emergencies ...............................................................31
Electrical System Emergencies........................................................32
High Voltage on Main Bus 1 .........................................................32
High Voltage on Main Bus 2 .........................................................33
High or Low Voltage on Essential Bus..........................................34
Environmental System Emergencies ...............................................35
Carbon Monoxide Level High........................................................35
Oxygen System Emergencies..........................................................36
Oxygen System Fault - Above 10,000 Ft ......................................36
Oxygen Quantity Low....................................................................37
Integrated Avionics System Emergencies........................................38
Unusual Attitude Emergencies.........................................................39
Inadvertent Spin Entry ..................................................................39
Inadvertent Spiral Dive During IMC Flight.....................................40
Other Emergencies ..........................................................................41
Power Lever Linkage Failure ........................................................41
Emergency Engine Shutdown On Ground....................................41
Left/Right Brake Over-Temperature..............................................42
Starter Engaged............................................................................42
Emergency Ground Egress...........................................................43
CAPS Deployment ........................................................................44
Original Issue