Screen
Parameters
Partial reactive energy, quadrant 4
Hours in partial operation
(since the last partial reset )
Cost of the
partial active energy consumed
(since the last partial reset )
(1)
CO
2
emissions into the atmosphere.
(since the last partial reset )
(2)
(1)
If a Cost value has been programmed in the setup menu (see
(2)
If a CO
2
emissions value has been programmed in the setup menu (see
20
CEM-C30
Instruction Manual