Content
ENGLSIH
13
Contents Page
1.0 Introduction/Scope of Supply ..............................14
1.1 Transport and Storage .........................................15
2.0 Safety Measures .................................................15
3.0 Danger of electrical shock ....................................15
4.0 Intended use .........................................................16
5.0 Control elements and connections .....................17
6.0 Carrying out measurements ...............................17
6.1 Preparation and Safety ........................................17
6.2 Voltage Test .........................................................18
6.3 Single-Pole Phase Test ........................................18
6.4 Continuity Test ......................................................18
5.0 Maintenance .........................................................18
5.1 Cleaning ...............................................................19
5.2 Calibration Interval ...............................................19
5.3 Battery Replacement ............................................19
6.0 Technical Data ...................................................19
24 month Warranty ........................................................20
MPM00061-FLM-000-00-final.indd 13
04.07.2014 10:38:08