background image

 

 

 

 

 

 

 

 

 

4.   

ROUTINE MAINTENANCE AND PERIODIC CHECKS

 

 

 

These kinds of operations are at client’s expenses.

 

 

In case some malfunctioning of the unit are observed, please make sure this is not due to non-maintenance reasons, before you apply to qualified 
assistance. 

 

The accurate and periodic cleaning of the unit will reduce the risk of damages to the unit itself and to the products stored within.

 

 

See following tab for reference.

 

 

ATTENTION !

 Before starting any maintenance and cleaning operation make sure you operate on the 

main switch in order to deactivate tension 

(pic. 4)

 

 

 

 

   

(pic.4)

 

 

 

MAINTENANCE OPERATIONS AND THIR FREQUENCY. A SUMMARY TAB. 

OPERATION 

DESCRIPTION 

FREQUENCY 

Surfaces’ cleaning 

 

Wash exclusively with warm water and neutral soup; rinse abundantly and wipe off with a soft 
cloth. 

 

Do not use abrasive products 

 

weekly 

Plastic surfaces’ cleaning 

 

Wash exclusively with warm water and neutral soup; rinse abundantly and wipe off with a soft 
cloth. 

 

Do  not  use  alcohol,  acetone  and  any  solvent  that  might  spoil  the  look  and  structure  of  the 
material. 

 

weekly 

Glass surfaces’ cleaning 

 

Use only specific products for glass cleaning 

 

Using water alone might lead to calcareous deposits on the glass surfaces 

 

daily 

Wooden surfaces’ cleaning 

 

Use exclusively a wet cloth. 

weekly 

 
 
Additional defrost 

 

Under  particular  conditions  of  temperature  and  humidity,  the  frost  that  normally  forms  on  the 
evaporator and fans might increase in volume, so leading to a faulty functioning the unit. 

 

If these conditions should last, the assistance of a qualified technician shall be needed. Waiting 
for this service, it is suggested to operate one or more defrost cycles (despite the damages this 
might cause to the stored product) 

 
 

Waiting for 

qualified 

assistance 

 
 
 
Periodic defrost 

 

In  order  to  obtain  the  best  performance  from  the  cooling  system,  we  suggest  to  operate  an 
extended defrost cycle. 

 

Before you do that, please remove displayed products from inside the cabinet; always operate 
an additional defrost cycle in order to remove from the evaporator the largest possible amount 
of frost or ice. Turn the main switch off for 5 hours (min.) 

 

Before re-starting the unit, make sure that frost has totally melted and wipe carefully.  

 
 
 

max. 15 DAYS 

ATTENTION!    DO NOT CLEAN THE UNIT WITH WATER JETS 

 

5.    EXTRAORDINARY MAINTENANCE 

This type of operation has to be made by qualified technician only. 

 

ATTENTION!

  

Before operating any maintenance, make sure the tension is deactivated. (pic.11). 

 

 

Lamps’ replacement:  qualified technician needed. 

 

 

Air condenser cleaning:  qualified technician needed. When the fan is switched off you can clean the condenser 
with a compressed air jet. Never use metallic brushes. Use protection gloves  

(pic.5).

 

 

 

 

 (Pic. 5.) 

Summary of Contents for 6040 Series

Page 1: ...Refrigerated Pastry Showcase 6040 SERIES Maintenance And Use Manual CIAMspa 06081 Petrignano d Assisi PG Italy tel 075 80161 Fax 075 8016215 http www ciamgroup it e mail info ciamgroup it...

Page 2: ...or refrigerators freezers and ice machines 1 4 RESPONSIBILITY Ciam declines any responsibility relevant to damages on persons animals and or products in case of No respect of in force norms Installati...

Page 3: ...ong stock have not to be ascribed to the manufacturer 3 4 DISPLAY CABINET POSITION The refrigerated display cabinet needs particular environmental conditions in order to offer the right performance so...

Page 4: ...et in order to make easy any type of check and maintenance operations When the condensing units are external will be necessary a frame holder that has to be fixed in a proper way and eventually added...

Page 5: ...a wet cloth weekly Additional defrost Under particular conditions of temperature and humidity the frost that normally forms on the evaporator and fans might increase in volume so leading to a faulty f...

Page 6: ...G ELEMENT SUCTION AIR GLASS HEATING ELEMENT OUTLET AIR HEATING ELEMENT REAR GLASS HEATING ELEMENT INTERNAL GLASS HEATING ELEMENT FRONT GLASS UPPER FRAME HEATING ELEMENT FRONT GLASS LATERAL LOWER FRAME...

Page 7: ......

Page 8: ......

Page 9: ...s length is set in the Fdt parameter With Fdt 0 the dripping time is disabled 3 3 CONTROL OF EVAPORATOR FANS The fan control mode is selected by means of the FnC parameter FnC C_n fans will switch ON...

Page 10: ...THE HIDDEN MENU TO THE FIRST LEVEL AND VICEVERSA Each parameter present in the HIDDEN MENU can be removed or put into THE FIRST LEVEL user level by pressing SET n In HIDDEN MENU when a parameter is p...

Page 11: ...ture alarm delay 0 255 min time interval between the detection of an alarm condition and alarm signalling dAO Exclusion of temperature alarm at start up from 0 0 min to 23 5h time interval between the...

Page 12: ...TORING SYSTEMS The TTL serial line available through the HOT KEY connector allows by means of the external TTL RS485 converter XJ485 CX to connect the instrument to a monitoring system ModBUS RTU comp...

Page 13: ...ous cycle duration 0 0 24 0h 0 0 Pr2 CCS Set point for continuous cycle 55 0 150 0 C 67 302 F 5 Pr2 COn Compressor ON time with faulty probe 0 255 min 15 Pr2 COF Compressor OFF time with faulty probe...

Page 14: ...50 min nu 13 0 rtc Sd3 3rd holiday defrost start 0 23h 50 min nu 21 0 rtc Sd4 4th holiday defrost start 0 23h 50 min nu 0 0 rtc Sd5 5th holiday defrost start 0 23h 50 min nu 0 0 rtc Sd6 6th holiday de...

Page 15: ...standard way for controller without RTC with EdF rtc the defrost is made in real time depending on the hours set in the parameters Ld1 Ld6 on workdays and in Sd1 Sd6 in holidays Other parameters are u...

Page 16: ...visualization rEd X REP display optional P1 P2 P3 P4 SET dtr it selects which probe is displayed by X REP P1 Thermostat probe P2 Evaporator probe P3 Third probe only for model with this option enabled...

Page 17: ...will restart only if the digital input is disabled otherwise the instrument will wait until the MdF safety time is expired 8 6 INVERSION OF THE KIND OF ACTION HEATING COOLING i1F Htr This function all...

Page 18: ...XW20LS DIRECT CONNECTIONS OF LOAD Supply 120Vac or 24Vac connect to terminals 5 6 The X REP output is optional 17 DEFAULT SETTING VALUES Label Name Range C F Level Set Set point LS US 3 0 rtc Real tim...

Page 19: ...start 0 23h 50 min nu 0 0 rtc Sd6 6th holiday defrost start 0 23h 50 min nu 0 0 rtc Adr Serial address 1 247 1 Pr2 PbC Kind of probe Ptc ntc ntc Pr2 onF on off key enabling nu oFF ES oFF Pr2 dP1 Room...

Reviews: