(5) Install retainer, spring, limit valve, and 2-3
throttle plug from limit valve housing.
(6) Install limit valve housing and cover plate.
Tighten screws to 4 N·m (35 in. lbs.).
(7) Install shuttle valve as follows:
(a) Insert plastic guides in shuttle valve second-
ary spring and install spring on end of valve.
(b) Install shuttle valve into housing.
(c) Hold shuttle valve in place.
(d) Compress secondary spring and install E-clip
in groove at end of shuttle valve.
(e) Verify that spring and E-clip are properly
seated before proceeding.
(8) Install shuttle valve cover plate. Tighten cover
plate screws to 4 N·m (35 in. lbs.) torque.
(9) Install 1-2 and 2-3 valve governor plugs in
valve body.
(10) Install shuttle valve primary spring and
throttle plug.
(11) Align and install governor plug cover. Tighten
cover screws to 4 N·m (35 in. lbs.) torque.
Fig. 316 Upper Housing Control Valve Locations
1 - UPPER HOUSING
8 - MANUAL VALVE
2 - REGULATOR VALVE
9 - 1-2 GOVERNOR PLUG
3 - SWITCH VALVE
10 - GOVERNOR PLUG COVER
4 - REGULATOR VALVE SPRING
11 - THROTTLE PLUG
5 - KICKDOWN VALVE
12 - 2-3 GOVERNOR PLUG
6 - KICKDOWN DETENT
13 - SHUTTLE VALVE PRIMARY SPRING
7 - THROTTLE VALVE AND SPRING
21 - 304
AUTOMATIC TRANSMISSION - 48RE
DR
VALVE BODY (Continued)