25
English
Step 13:
Installation of Stepper and Crossbar (22) at support 1 (4).
1. Place the crossbar (22) into appropriate position at support 1 (4)
and rear foot (2), so that the holes are align and screw it tightly by
using screw M10x70 (112), washers 10//20 (118) and self locking nut
M 10 (124). (Note: Perhaps you have to loosen the connection point
of support 1 (4) and rear foot (2) a little bit to mount crossbar easy.)
2. Put the left and right pedal (21+24) in right direction at appropriate
holder at support 1 (4), that the steel bearings align and slide the
axle 1 (34) through. Secure the axle 1(34) by using screw M8x15
(99), spring washer for M8 (123) and washer 8//38 (120) on both
ends of axle.
3. Put the hydraulic cylinder (58) with top side onto the holder of
crossbar (22) and secure this position by using screw M8x15 (99),
spring washer for M8 (123) and washer 8//28 (121).
4. Scew the bottom end of cylinder (58)at the holder for cylinder (46)
by using screw M8x40 (103), washer 8//16 (117) and self locking nut
M 8 (125). Ensure that the cylinder (58) can turn at holder a little bit.
5. Insert the holder for hydraulic cylinder (46) from top side trough
the pedal left and right (21+24) and connect the holder (46) into
desired position by using handgrip nut (75) and washer 10//38 (120).
You can adjust the stepper resistance at holder (46) by choosing
different positions at pedal left and right (21+24)
6. Put a cable roller unit as figure „A“ show together, put the cable
5 (59) over the pulley (83) and connect this at cable pulley holder
incl. hook (35) in a way that the cable pulley can roll easy.
7. Insert the cable pulley holder incl. hook (35) into the welded holder
at crossbars‘ (22) bottom side and connect the ends of cable 5 (59)
with the pedal left and right (21+24).
8. Then put the screw caps for M10 (131) onto all M10 screw heads
and nuts and the screw caps(132) for M8 onto all M8 screw heads
and nuts.
Step 14:
Installation of cable 1 for latissimus (26) with cable pulley units.
Please note following situation regarding the cable pulley units:
The cables have to put on the cable pulleys (83) and should
covered on both sides with cable pulley covers (84) that the
input and output of cable is leaded.
The cable pulley units have to install at the same time with
cables at right position.
1. Put the cable 1 (26) as showed in Step 14 drawing through the
top cross beam (5), screw the screw end of cable 1 (26) with washer
12//24 (119) into the weight disk bar (40) and secure the screw with
nut. (The cable system can be finely adjusted on this cable screw.
The rope screw must always be screwed in at least 12mm deep
and additionally countered by the nut.)
2. Take cable 1 (26) and a cable pulley unit as showed in figure
„A“ (without cable pulley cover) with screw M10x70 (112), washer
10//20 (118), plastic bushing for pulley (94) and nut M10 (124).
Insert the cable pulley (83) into the top cross beam (5), position
the plastic bushing (94) from outer side of top cross beam (15) and
screw in tightly.
3. Put a cable roller unit as figure „B“ shows together with screw
M10x45 (110), washer (118) and self locking nut (124), insert the
cable 1 (26) and connect this at top cross beam (5).
4. Take cable 1 (26) and a cable pulley unit as showed in figure „B“
with screw M10x70 (112), washer 10//20 (118), plastic bushing for
pulley (94) and nut M10 (124) and attach it at cable pulley holder 2 (6).
5. Then put the screw caps for M10 (131) onto all M10 screw heads
and nuts.
Summary of Contents for 9988
Page 3: ...3 Deutsch...