Chapter 7
Installation and commissioning
28
6501288-EN / 04
7
Installation and commissioning
The installation / first commissioning of the installation is carried out by Otto Christ AG or
by a commissioned subcontractor, who is exclusively responsible with the assistance of
order specific instructions.
The basic settings of the installation are already specified and when necessary, may only
be changed by the customer service of Otto Christ AG or persons charged by Otto Christ
AG.
The briefing regarding the installation is carried out by Otto Christ AG or by a commis-
sioned subcontractor, who is exclusively responsible.
7.1
Basic setting
7.1.1
Water system
Basic setting
•
Pressure reducer, fresh and recycled water
– 3.5 bar
•
Pressure switch, fresh and recycled water
– 1 bar
7.1.2
Dosing pumps
Dosing pump
•
Stroke length
– Shampoo (M7) 100 %
– Drying aid (M8) 100 %
– Pre-wash chemistry (M9) 100 %
– Active foam (M34) 100 %
•
Stroke frequency
– Shampoo (M7) 40 %
– Drying aid (M8) 30 %
– Pre-wash chemistry (M9) 40 %
– Active foam (M34) 40 %
INFORMATION
Observe the wash and drying quality after a modification.
7.1.3
Water emptying
•
Compressed air cylinder
– Flow pressure
7 bar
•
Thermostat
– Temperature
4 °C
Installation / first
commissioning
Basic setting
Briefing