5 Set-up and connection
Version 11/2006, Rev. 2.2 of 17/10/2016
• sb
33 / 102
Translation of the original operating manual
Pos : 93 / 200 C hrist/ 360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/ 050 Aufst ellung und Anschl uss/ 050- 0020 Energievers orgung--------------------------------------- @ 25\ mod_1404983740008_68. doc x @ 183537 @ 2 @ 1
5.2
Power supply
Pos : 94 / 200 C hrist/ 361 GT-BA Labor-Pilot (PR OJEKT E)/Al pha/ Alpha 1-4_2- 4 LDpl us/ 050 Aufst ellung und Anschl uss /050- 0020-0010 Ans chl uss art Alpha 1-4_2- 4 LDpl us @ 35\ mod_1430380090236_68. doc x @ 258823 @ 3 @ 1
5.2.1
Connection
DANGER
The operating voltage on the name plate must correspond to the local
supply voltage
CHRIST freeze-dryers are units of safety class I.
Alpha 1-4 LDplus
and
Alpha 2-4 LDplus
units have a three-wire power
cord with a fixed cable(see chapter 10 - "Technical data").
An equipotential bonding screw is located on the back below the mains
power input (see chapter 2.1.1 - "Functional and operating elements"). This
equipotential bonding screw can be used to perform an earth conductor
check.
Pos : 95 / 010 U ni vers al module/ Leerz eile @ 0\ mod_1202116244500_0. doc x @ 114 @ @ 1
Pos : 96 / 200 C hrist/ 360 GT-BA Labor-Pilot (ST ANDARDM ODU LE)/ 050 Aufst ellung und Anschl uss/ 050- 0020-0020 Sicherungen baus eits @ 25\ mod_1404983741015_68. doc x @ 183551 @ 3 @ 1
5.2.2
Customer-provided fuses
Typically, the freeze-dryer must be protected with 16 Amp G fuses that are
to be provided by the customer.
Pos : 97 / 010 U ni vers al module/ Leerz eile @ 0\ mod_1202116244500_0. doc x @ 114 @ @ 1
Pos : 98 / 010 U ni vers al module/ Leerz eile @ 0\ mod_1202116244500_0. doc x @ 114 @ @ 1
Pos : 99 / 200 C hrist/ 361 GT-BA Labor-Pilot (PR OJEKT E)/Al pha/ Alpha 1-4_2- 4 LDpl us/ 050 Aufst ellung und Anschl uss /050- 0030 Belüft ungs- und M edienablauf ventil Alpha 1- 4_2- 4 LDpl us @ 35\ mod_1430728044599_68.doc x @ 259092 @ 2 @ 1
5.3
Aeration and media drain valve
The aeration and media drain valve is located on the left side of the unit
(see chapter 2.1.1 - "Functional and operating elements").
After the end of a freeze-drying process, the unit will be aerated via the
aeration valve.
Additionally, it is used to drain off the condensate and the defrosting water.
• Connect the drain hose (included in the scope of supply) to the hose
connector.
• Place a collecting vessel under the unit.
The hose must be laid with a continuous slope and the end of the hose
must always be above the liquid level in the collecting vessel. This prevents
water and dirt residues from being sucked into the ice condenser chamber
if there is negative pressure when the media drain valve is opened.
NOTE
The ice condenser chamber can be flooded with nitrogen via the hose
nozzle of the aeration valve.