![Chore-Time KONAVI Installation And Operator'S Manual Download Page 28](http://html1.mh-extra.com/html/chore-time/konavi/konavi_installation-and-operators-manual_2603216028.webp)
Auger/End Control Installation
28
8.Install the Metal Water Tight Connector
(Item 1)
in the Power Unit
(Item 2)
. Cut the Flex Conduit
(Item 3)
to length. Slide the wires from the end control through the Flex Conduit
(Item 3)
. Install the Flex Conduit
(Item 3)
in the connectors.
9.See
“Power Unit Wiring” on page 39
for wiring for various Power Units
.
10.Attach all covers and wire according to the wiring section of this manual.
11.Pull the auger at the boot end until it begins stretching. Then let it relax. In the
relaxed
position, mark the
auger at the end of the boot.
12.Auger stretch:
The auger needs to be stretched 7"
[180 mm]
per 100’
[30 m]
. Example: A 300’
[90 m]
feeder line requires
21"
[500 mm]
of stretch.
Beginning at the
relaxed
position, measure the required amount of stretch. Mark the auger at that point.
Grip the auger 8"
[200 mm]
ahead of this mark with locking pliers. Allow the auger to pull back into the boot
so that the pliers rest against the end of the boot.
Figure 34.Installing Water Tight, Cutting and Installing Conduit
Item
Description
Part No.
1
Water Tight Connector
23810
2
Power Unit
--
3
Flex Conduit
*Items 1 & 3 in
3
1
2
3
1
2
Motor without Conduit Box
Motor with Conduit Box
Figure 35.Measure the Auger from the relaxed position
Mark the Auger at the end of
the Boot (Relaxed)