15
Once your
ChlorKing®
system has been successfully wired and plumbed, it is
ready for use.
•
Make sure that the valves to and from the cell are in the open position.
•
Make sure that you have water flowing through the water-cooled heat sink
in box 3.
•
Ensure that the cord labeled ORP is either plugged into a controller or
directly into a 110v outlet
1. Move the safety switch to the “on” position.
2. Wait 10 seconds for the system to respond.
3. Turn the black knob on the side of box 1 clockwise, and watch the
amp or voltmeter on box 3 slowly increase.
(
If your system is linked to an automatic ORP controller, we suggest you
turn the system to maximum, which will allow for full production every time
the controller calls for it. If you are running your system manually you will
need to find the point at which you keep a satisfactory level of chlorine in
the water. It may take several days to find this point.
•
If your
ChlorKing®
system is linked to an automatic controller, remember
that it will only work when the controller is in feed mode. It is also a good
idea to make sure that your controller is not set in proportional band mode,
instead try using double set point control (if your controller supports this
function). An example of this is if you want to maintain a 700 ORP, have
the controller set to turn on at 695 ORP and turn off at 705 ORP, that way
your
ChlorKing®
system is not switching on and off all the time.
(Call the manufacturer of your controller if you are having difficulties in
comprehending the saline chlorination system set up instructions. Most
controllers also require a “gold tip” ORP probe when working with a saline
chlorination system.)
STARTING THE SYSTEM