![Chiltrix CX45 Installation And Operation Manual Download Page 34](http://html1.mh-extra.com/html/chiltrix/cx45/cx45_installation-and-operation-manual_2601710034.webp)
34
Electric connections
General
Note!
Electrical installation and service must be carried out under the supervision of a qualified electrician.
Electrical installation and wiring must be carried out in accordance with the NEC.
The heat pump must not be connected without the permission of the electricity supplier and must be
connected under the supervision of a qualified electrician. Wires, spare parts and materials etc. must
satisfy the relevant standards issued by the host country or region.
The heat pump does not include an AC disconnect or switch on the incoming electrical supply. The
power supply cable must be connected to a circuit-breaker with at least a 3 mm breaking gap.
Incoming supply must comply with the technical requirements, with ground wire, via a distribution
board with breakers.
Maximum current draw is 13 amps, minimum wire size is 12 AWG, Minimum breaker size is 20
AMP.
Summary of Contents for CX45
Page 4: ...4...
Page 9: ...9 Freeze protection...
Page 10: ...10...
Page 11: ...11...
Page 12: ...12...
Page 13: ...13...
Page 14: ...14...
Page 15: ...15...
Page 16: ...16...
Page 17: ...17...
Page 18: ...18...
Page 19: ...19...
Page 20: ...20...
Page 21: ...21...
Page 22: ...22...
Page 23: ...23...
Page 24: ...24...
Page 33: ...33 Clearances unit mm 200mm 8 350mm 14 400 16 500 20 1000 40...
Page 39: ...39 G3 VALVE Seasonal Switch Valve Solar Pre heat Valve...
Page 40: ...40 G1 Valve DHW and AC...