Chilicon Power Residential Design and Installation Guide
2
Contact Information:
US Customer Service
Chilicon Power Inc
15415 Sunset Blvd Suite 102
Pacific Palisades, CA 90272
Tel: (310) 800-1396
www.chiliconpower.com
Safety Directives and Code Compliance
Chilicon Power directs all customers to comply with all national and local safety and code requirements when
installing equipment. To maintain product warranty, these directions must be followed when installing, operating
and servicing the unit. If ignored, injury or death may happen, as well as damage to the unit.
Read these Instructions before working on the unit. If you are unable to understand the Dangers, Warnings,
Cautions or Instructions, contact the manufacturer or authorized service agent before installing, operating and
servicing the unit. The inverters described in this document meets the requirements stipulated in:
•
NEC 2017 Section 690.11 &12 Rapid Shutdown of PV Systems on Buildings
•
NEC 2017 Section 705.12 Point of Connection
•
IEEE 1547-2018 IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with
Associated Electric Power Systems Interfaces
•
UL 1741 SA
Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use
with Distributed Energy Resources
•
IEEE 2030.5-2018
IEEE Standard for Smart Energy Profile Application Protocol
Other Information
All information, instructions, specifications, and illustrations in this manual are those in effect at the time of
printing. Chilicon Power reserves the right to change specifications or design at any time without notice.
For the most current information, please visit our website at
All trademarks are recognized as the property of their respective owners.
Copyright © 2020 Chilicon Power. All rights reserved.