![Chike e-cargo Operating Instructions Manual Download Page 48](http://html1.mh-extra.com/html/chike/e-cargo/e-cargo_operating-instructions-manual_2601267048.webp)
40
A
B
C
D
E
F
F.
Part
Maintenance
Interval
By
Tires
Checking tire pressure
before every
ride
user
Checking running surface and side walls
for damage and sufficient profile
before every
ride
user
Changing tires
if necessary
user
brakes
Checking hydraulic hoses for damage,
brake test
before every
ride
user
Checking brake pads
see section
p.29
user
Changing brake pads
if necessary
user
Changing brake disk
if necessary
dealer
bleeding brakes
if necessary
dealer
chain
Lubricate and check for wear
monthly
user
changing
if necessary
dealer
chassis
Checking toe angle
see section
p.31
user
Adjusting the toe angle
if necessary
dealer
Checking tie rod ends for play
before every
ride
user
Changing tie rod ends
if necessary
dealer
Wheels
Checking spoke tension and run-out
monthly
user
Steering
Checking that there is no play
before every
ride
user
Checking the handlebars for damage
before every
ride
user
Summary of Contents for e-cargo
Page 1: ...ba the cargobike Operating Instructions ...
Page 2: ......
Page 4: ...iv ...
Page 6: ...vi ...
Page 8: ...viii ...
Page 18: ...10 ...
Page 22: ...14 ...
Page 24: ...16 ...
Page 36: ...28 ...
Page 55: ...47 A B C D E F G Appendix ...
Page 57: ...49 A B C D E F G Appendix ...
Page 58: ......
Page 59: ......
Page 60: ......