Installation Instructions
XBM1U/XBM1UP
7
Assembly And Installation
Bolt Down Columns to Floor
1.
Lay array columns (M) down on a flat surface.
2.
Use four 5/16-18 x 1 1/2” flat head cap screws (L) to connect
each bolt down plate (DD) to each column (J). (See
Figure 1)
IMPORTANT ! :
Inside bolt pattern is NOT square!
Corners of front of plate have larger radii than corners on
back of plate. Plate must be properly aligned in order to
attach to column.
Figure 1
3.
Using bolt down plates (DD) as templates, mark four holes
at outside hole locations for each column. (See Figure 2)
WARNING:
Do NOT install XBM1U mounts to any surface
other than concrete! Concrete flooring must be at least 4" in
thickness and NOT be covered with any other type of flooring
material. Concrete anchors must be installed directly into
concrete surface.
IMPORTANT ! :
See Bolt Down Dimensions on page 3 to
measure distances between each bolt down plate.
IMPORTANT ! :
Make sure columns will be installed far
enough away from any walls so that displays may be
installed.
4.
Using a 3/8” drill bit, drill a hole 3 1/2” in depth at each
marked location. (See Figure 2) and (See Figure 3)
5.
Blow each hole clean of any concrete debris with a large air
hose or compressed air in a can. (See Figure 3)
IMPORTANT ! :
Do NOT modify the anchors or advance
the bolt in the anchors prior to installation!
6.
Place each bolt down plate (DD) on top of drilled holes
making sure holes on plate are aligned with drilled holes.
(See Figure 3)
7.
Use a hammer to drive anchors (M) through plate holes into
the drilled holes until the bolt head is firmly seated against
the plate. (See Figure 2) and (See Figure 3)
8.
Tighten each anchor by turning the head three to four turns
past finger tight. (See Figure 3)
Figure 2
Figure 3
9.
Repeat Steps 4-8 for additional column.
2
(L) x 4
(J)
(DD)
larger radii in front
3
4
3/8”
6
(M) x 4
7
4
3/8”
3 1/2” deep
5
air hose
(M) x 4
7
(DD)
(M) x 4
8
(DD)