background image

Installation Instructions

XBM1U/XBM1UP

7

Assembly And Installation

Bolt Down Columns to Floor

1.

Lay array columns (M) down on a flat surface.

2.

Use four 5/16-18 x 1 1/2” flat head cap screws (L) to connect
each bolt down plate (DD) to each column (J).      (See
Figure 1)

IMPORTANT ! :

Inside bolt pattern is NOT square!

Corners of front of plate have larger radii than corners on
back of plate. Plate must be properly aligned in order to
attach to column.

Figure 1

3.

Using bolt down plates (DD) as templates, mark four holes
at outside hole locations for each column. (See Figure 2)

WARNING:

Do NOT install XBM1U mounts to any surface

other than concrete! Concrete flooring must be at least 4" in
thickness and NOT be covered with any other type of flooring
material. Concrete anchors must be installed directly into
concrete surface.

IMPORTANT ! :

See Bolt Down Dimensions on page 3 to

measure distances between each bolt down plate.

IMPORTANT ! :

Make sure columns will be installed far

enough away from any walls so that displays may be
installed.

4.

Using a 3/8” drill bit, drill a hole 3 1/2” in depth at each
marked location. (See Figure 2) and (See Figure 3)

5.

Blow each hole clean of any concrete debris with a large air
hose or compressed air in a can. (See Figure 3)

IMPORTANT ! :

Do NOT modify the anchors or advance

the bolt in the anchors prior to installation!

6.

Place each bolt down plate (DD) on top of drilled holes
making sure holes on plate are aligned with drilled holes.
(See Figure 3)

7.

Use a hammer to drive anchors (M) through plate holes into
the drilled holes until the bolt head is firmly seated against
the plate. (See Figure 2) and (See Figure 3)

8.

Tighten each anchor by turning the head three to four turns
past finger tight. (See Figure 3)

Figure 2

Figure 3

9.

Repeat Steps 4-8 for additional column.

2

(L) x 4

(J)

(DD)

larger radii in front

3

4

3/8”

6

(M) x 4

7

4

3/8”

3 1/2” deep

5

air hose

(M) x 4

7

(DD)

(M) x 4

8

(DD)

Summary of Contents for XBM1U

Page 1: ...Instalação Istruzioni di installazione Installatie instructies Instructions d installation XBM1U XBM1UP Extra Large Bolt Down Video Wall Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description XBM1U XBM1UP ...

Page 2: ...NG Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment Reinforce the structure as required before installing the component WARNING Do NOT stack multiple accessories...

Page 3: ...Installation Instructions XBM1U XBM1UP 3 DIMENSIONS 21 23 539 2 17 00 431 8 33 00 838 2 250 LBS XBM1U 31 50 800 0 MAX MOUNTING PATTERN HEIGHT 36 00 914 4 21 23 539 2 250 LBS XBM1UP ...

Page 4: ...XBM1U XBM1UP Installation Instructions 4 Bolt Down Dimensions 17 00 431 8 33 00 838 2 8 00 203 2 0 50 12 7 25 00 635 0 1 00 25 4 BOTTOM VIEW FOR BOLT DOWN INSTALLATION ...

Page 5: ...l Chave de bocas Chiave a punte aperte Steeksleutel Clé à fourche By Hand A mano Von Hand Com a mão A mano Met de hand À la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perfor...

Page 6: ...x16mm H 4 M8x25mm I 2 1 4 20 x 1 1 4 DD 2 bolt down plate J 2 cart array column K 2 column cap N 2 clamp bracket Q 2 quick connect base L 8 5 16 18 x 1 1 2 P 1 3 16 hex bit M 8 3 8 x 3 anchor S 1 left interface T 1 right interface V 2 5 16 18 x 4 1 2 W 16 5 16 18 x 3 4 X 8 5 16 U 8 5 16 18 x 1 2 Z 4 5 16 18 AA 1 3 16 BB 1 1 8 CC 1 5 32 Y 6 snap cover single display rail R 1 EE 2 Column add on FF 1...

Page 7: ...ensions on page 3 to measure distances between each bolt down plate IMPORTANT Make sure columns will be installed far enough away from any walls so that displays may be installed 4 Using a 3 8 drill bit drill a hole 3 1 2 in depth at each marked location See Figure 2 and See Figure 3 5 Blow each hole clean of any concrete debris with a large air hose or compressed air in a can See Figure 3 IMPORTA...

Page 8: ...columns in the position of where the center of the display will be on the cart with the diamond on the brackets being placed at the exact center location See Figure 5 Figure 5 3 Use 5 16 18 x 4 1 2 button head cap screw V two 5 16 washers X and 5 16 18 lock nut Z to secure each clamp bracket N to column See Figure 5 4 Use four 5 16 18 x 3 4 button head flange screws W to secure each attached clamp...

Page 9: ...ing holes are recessed or if protrusions prevent brackets S and T from laying flat then spacers E must be used CAUTION Using screws of improper length may damage your display Proper screws will have adequate thread engagement without contacting bottom of display mounting holes 4 Select screw length See Figure 9 or See Figure 10 Using your hand insert SHORTEST length screw of selected diameter A or...

Page 10: ...1 4 socket head cap screws I to secure interface brackets S and T to rails for each display Screws must engage through both holes to be fully secured See Figure 11 NOTE Display positions may need to be adjusted after height and or plumb adjustments in order to maintain desired alignment Figure 11 Column Cap Installation NOTE If the top holes on columns will be used for cable management do NOT inst...

Page 11: ...te cables from displays through nearest holes on front of columns and out through back cable management hole See Figure 14 NOTE For best access route display cables through columns prior to display installation Figure 14 Additional Cable Management Options 2 Cables may be routed through tops of columns and out through the back cable management hole See Figure 15 Figure 15 3 For any cable managemen...

Page 12: ...94 6918 Europe A Franklinstraat 14 6003 DK Weert Netherlands P 31 0 495 580 852 F 31 0 495 580 845 Asia Pacific A Office No 918 on 9 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong P 852 2145 4099 F 852 2145 4477 Chief a products division of Milestone AV Technologies 8800 002674 Rev00 2015 Milestone AV Technologies www chiefmfg com 02 15 ...

Reviews: