WM210-220-230-240S/SI
Installation Instructions
14
4.
Lower the upper cover (X) onto the wall mount and lower
cover, and fasten with two 8-32 x 3/8" Phillips pan head
screws (AB). (See Figure 24)
NOTE:
Be sure cables and cords are not pinched between
upper and lower covers.
Figure 24
Cable Management (Optional)
In most cases, cable management covers will NOT need to be
removed in order to route cables from projector to the wall
mount. But for some thick cables, removing the covers may be
necessary.
Removing Mount Covers
1.
Remove and save two 8-32 x 3/8" Phillips pan head screws
(AB) from upper cover. (See Figure 25)
2.
Raise and remove the upper cover from the mount. (See
Figure 25)
Figure 25
3.
Remove and save two 8-32 x 3/8" Phillips pan head screws
(AB) from lower cover. (See Figure 26)
Figure 26
4.
Remove the lower cover from the wall mount. (See Figure 26)
5.
Remove cable management covers (if necessary) from
short throw projector arm. (See Figure 27)
Figure 27
4
(AB) x 2
(X)
1
(AB) x 2
Upper
cover
2
3
(AB) x 2
Lower
cover
4
(bottom view)
5
5
Cable
management
covers