SLEU
Installation Instructions
10
8.
Feed control wires from UP and Down sides of control
switch through strain relief and into J-Box. (See figure 14)
9.
Connect the BROWN wire from the UP limit switch to the
wire from the UP side of control switch using a wire nut.
(See figure 14)
10. Connect the BLACK wire from the DOWN limit with to the
wire from the DOWN side of control switch using a wire nut.
(See figure 14)
11. Carefully place all connections into J-Box making sure wire
nut connections stay in tact.
12. Replace cover onto J-Box.
Cable Routing and Management
1.
Feed video/communication cable through strain relief on the
rear of lift housing, and connect to projector. (See
figure 15)
IMPORTANT ! :
The lift carriage travels approximately 8 1/2"
(215mm) when moving from fully UP to fully DOWN position.
Wires and cables connected the projector MUST be of proper
length to allow for this travel.
WARNING:
IMPROPER WIRE AND CABLE ROUTING
CAN LEAD TO LOSS OF SIGNAL QUALITY OR DAMAGE
TO EQUIPMENT. Make certain wires are routed away from
pinch points and properly secured to lift.
2.
Secure video or communications cable(s) to lift housing.
3.
Tighten strain relief screws to secure cables.
Figure 14
From UP side of Control Switch
From DOWN side of Control Switch
Black wire from DOWN Limit switch
to wire from Down side of Control Switch
Brown wire from UP Limit switch
to wire from UP side of Control Switch
Figure 15
Video/Communications Cables
Allow for 81/2" of carriage travel
when routing cables.
(Carriage shown down)