QMP1T
Installation Instructions
4
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
M3 (included)
A (2)
[Array clamp, outer]
B (2)
[Array clamp, inner]
C (1)
[Table bracket]
D (1)
[Table brace]
E (1)
[Attachment plate]
F (1)
[Table top]
G (6)
[Cable tie, 5-1/2"]
H (1)
10-24 x 1/2"
J (6)
10-24 x 3/8"
K (4)
1/4-20 x 3/4"
L (6)
#10 x 5/8"
M (4)
10-24
N (2)
#10
P (1)
M3