background image

 MSP-WM46UN2X2

Installation Instructions

4

TOOLS REQUIRED FOR INSTALLATION

PARTS

3/8" (9.5mm)-concrete

#2

3/8" (9.5mm)

1/4" (6.35mm)-wood

A(2)

[horizontal wall bracket]

B(2)

[vertical bracket]

C(1)

[left vertical bracket]

D(1)

[right vertical bracket]

E(4)

[edge attachment bracket]

F(1)

[middle attachment bracket]

G(20)

[cable tie]

H(16)

[mounting button]

J(16)

M6 x 25mm

K(48)

M4 x 8mm

L(16)

5/16-18"

M(4)

[A10 anchor]

N(4)

3/8 x 2 1/2"

P(4)
3/8"

Q(1)

M5

(security)

Summary of Contents for MSP-WM46UN2X2

Page 1: ...truções de Instalação Istruzioni di installazione Installatie instructies Instructions d installation 2 X 2 Array Wall Mount Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description MSP WM46UN2X2 ...

Page 2: ...of damage or destruction of equipment if you do not follow the corresponding instructions WARNING Failure to read thoroughly understand and follow all instructions can result in serious personal injury damage to equipment or voiding of factory warranty It is the installer s responsibility to make sure all components are properly assembled and installed using the instructions provided WARNING Failu...

Page 3: ...el Chave de bocas Chiave a punte aperte Steeksleutel Clé à fourche By Hand A mano Von Hand Com a mão A mano Met de hand À la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perfo...

Page 4: ...m 1 4 6 35mm wood A 2 horizontal wall bracket B 2 vertical bracket C 1 left vertical bracket D 1 right vertical bracket E 4 edge attachment bracket F 1 middle attachment bracket G 20 cable tie H 16 mounting button J 16 M6 x 25mm K 48 M4 x 8mm L 16 5 16 18 M 4 A10 anchor N 4 3 8 x 2 1 2 P 4 3 8 Q 1 M5 security ...

Page 5: ...n on wall 2 Determine mounting slots to be used for installation See Note below and Figure 2 NOTE Slots used must be at least 24 apart Mount must be centered on anchors 4 1 2 See Figure 2 Figure 2 3 Using assembled mount as a template mark four holes in selected mounting holes on wall Use a level to make sure of an even mount See Figure 3 4 Drill four 3 8 holes in wall 2 1 2 deep at marked locatio...

Page 6: ...ll four 3 8 x 2 1 2 hex head lag screws N through holes on mount and into four drilled holes on wall See Figure 5 Figure 5 Install Displays WARNING Exceeding the weight capacity can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the combined weight of all components attached to the MSP WM46UN2X2 mount does not exceed 280 lbs 127 kg The we...

Page 7: ...igure 9 5 Move locking flag to closed position by wrapping it around mounting button See Figure 10 6 Slide flag towards center of the mount to secure flag around mouting button See Figure 10 7 Tighten screw to push mounting button towards center of mount and further secure display to mount See Figure 10 Figure 10 NOTE Slots on vertical brackets can be used for cable management by using cable ties ...

Page 8: ...of lower display See Figure 11 14 Repeat Steps 4 through 7 to install bottom right display 15 Install four M4 x 8mm security screws K through holes of edge attachment bracket E and into upper right holes of lower right display See Figure 12 16 Install four M4 x 8mm security screws K through holes of middle attachment bracket F and into upper left holes of lower right display See Figure 12 17 Insta...

Page 9: ...Installation Instructions MSP WM46UN2X2 9 ...

Page 10: ...MSP WM46UN2X2 Installation Instructions 10 ...

Page 11: ...Installation Instructions MSP WM46UN2X2 11 ...

Page 12: ...ompany www chiefmfg com 07 09 USA International A 8401 Eagle Creek Parkway Savage MN 55378 P 800 582 6480 952 894 6280 F 877 894 6918 952 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 24F Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA P 86 755 8996 9226 F 86 755 8996 9217 ...

Reviews: