LCM Video Wall Series
Installation Instructions
4
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
1/2"
1/2"
1/2"
nut driver
5/32"
(included)
7/32"
(included)
Hardware bag
A (16/24/36)
M6 x 12mm
B (16/24/36)
M6 x 16mm
C (16/24/36)
M6 x 30mm
D (16/24/36)
1/4"
E (16/24/36)
.750x.344x.500
F (16/24/36)
M8 x 12mm
G (16/24/36)
M8 x 16mm H (16/24/36)
M8 x 25mm
I
(8/12/18)
1/4-20 x 1-1/4"
P (4/4/6)
[End cap]
Q (8/8/12)
L (4/6/9)
[Interface bracket-right]
M (4/6/9)
[Interface bracket-left]
N (2/2/2)
X (4/4/6)
[Array
Y (4/4/6)
[Back
cover]
head]
[Array offset]
GG (2 - LCM2X2, LCM3X2)
[48" array column]
FF (2 - LCM2X2 only)
[Mounting rail]
AA (8/8/12)
[T-slot nut]
1/4-20 x 1/2"
R (8/8/8)
5/16-18 x 1/2"
S (16/16/16)
5/16-18 x 1"
T (16/16/16)
5/16"
U (16/16/16)
5/16"
V (2/2/2)
5/32"
W (2/2/2)
7/32"
Z (8/8/12)
5/16-18 x 2"
BB (8/8/12)
5/16"
CC (8/8/12)
[Friction
washer]
DD (16/16/24)
5/16"
EE (4/4/6)
5/16-18 x 3/4"
(Letters correspond
to letters on bag)
HH (2 - LCM3X2, LCM3X3)
[Mounting rail]
JJ (2 - LCM3X3 only)
[72" array column]
KK (2/2/2)
[Quantities of parts noted as: LCM2X2/LCM3X2/LCM3X3]
[CPA261]
[CPA261
5/16 x 1/2"
5/32"
Adapter]