background image

LCM Video Wall Series

Installation Instructions

10

Adding Displays to Mounting Rails

WARNING:

Exceeding the weight capacity can result in

serious personal injury or damage to equipment!  It is the
installer’s responsibility to make sure the combined weight of
all components located within the mounting system of the
LCM Series model does not exceed maximum weights listed
in table below.

WARNING:

Improper display installation can result in

serious personal injury or damage to equipment! Install
displays from the bottom to the top. Install all displays evenly
in each row before proceeding to a higher row. Do NOT
mount all of the displays on one side. On the LCM3X3, mount
the center display in each row prior to installing the outside
displays in that same row. (See Figure 13)

Figure 13

CAUTION:

BEFORE adding displays to the mounting rails,

ensure end caps are in place at BOTH ends of mounting rail!

1.

If necessary, make height adjustments to the bottom rail by
using adjustment points on the array heads (X).  (See
Figure 14)

2.

While holding mounting rail, loosen button head screws on
sides of array heads (X).

3.

Level and move mounting rail up or down as necessary.

4.

Tighten button head screws on sides of array heads (X).

Figure 14

5.

Open latch on attached interface brackets. (See Figure 15)

Figure 15

6.

Hang displays with attached interface brackets over
mounting rail.

7.

Raise latch on interface bracket and close into place against
mounting rail. (See Figure 15)

8.

Fasten latch into place using one 1/4-20 x 1-1/4" socket
head screw (

I

). (See Figure 15)

NOTE:

Socket head screws (

I

) must engage through both

holes to be fully secured. (See Figure 15)

9.

Repeat for each interface bracket on the mounting rail.

MODEL

Max Weight
Allowed for EACH
Display

Max Weight
Capacity of
Mounting System

LCM2X2U

125 lbs

(56.7 kg)

500 lbs

(226.8 kg)

LCM3X2U

125 lbs

(56.7 kg)

750 lbs

(340.2 kg)

LCM3X3U

85 lbs

(38.6 kg)

765 lbs

(347.0 kg)

2

1

3

5

4

6

8

7

9

4

2

3

5

Latch

8

(I)

x 2

7

NOTE:

 Secure

screw (

I

)

through both
holes.

OPEN

Latch
CLOSED

Summary of Contents for LCM2X2

Page 1: ...N S LCM2X2 LCM3X2 LCM3X3 Ceiling Mounted Video Walls Spanish Product Description German Product Description Portuguese Product Description Italian Product Description Dutch Product Description French...

Page 2: ...ailure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which...

Page 3: ...schl ssel Chave de bocas Chiave a punte aperte Steeksleutel Cl fourche By Hand A mano Von Hand Com a m o A mano Met de hand la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschl ssel Chave d...

Page 4: ...ght M 4 6 9 Interface bracket left N 2 2 2 X 4 4 6 Array Y 4 4 6 Back cover head Array offset GG 2 LCM2X2 LCM3X2 48 array column FF 2 LCM2X2 only Mounting rail AA 8 8 12 T slot nut 1 4 20 x 1 2 R 8 8...

Page 5: ...See Figure 1 5 Tighten two outside fasteners on each side of offset 6 Install and tighten fastener with washer removed in Step 2 into appropriate hole on each side of offset See Figure 1 Figure 1 7 Re...

Page 6: ...at CAUTION Using screws of improper length may damage your display Proper screws will have adequate thread engagement without contacting bottom of display mounting holes 4 Select screw length See Figu...

Page 7: ...FROM BOTTOM OF COUPLING TO TOP OF COLUMN 48 00 1219 2 COLUMN LENGTH 2X2 3X2 Screen Arrangement DIMENSIONS INCHES MILLIMETERS SCREEN HEIGHT APPROXIMATE ONE BOTTOM SCREEN APPROXIMATE C L OF 97 6 3 84 A...

Page 8: ...mark on the column IMPORTANT Match the center marks on the array head with the mark on the column See Figure 6 Figure 6 NOTE Installation of hex head self tapping screws will be easier when screws ar...

Page 9: ...nut DD to each stud on upper T slot nuts 3 Slide top T slot nuts AA with attached lock nuts DD down into top openings on array head X See Figure 11 4 Slide studs on lower T slot nuts AA into lower slo...

Page 10: ...ail 1 If necessary make height adjustments to the bottom rail by using adjustment points on the array heads X See Figure 14 2 While holding mounting rail loosen button head screws on sides of array he...

Page 11: ...ake plumb adjustments to each display See Figure 16 Figure 16 13 If necessary make height adjustments to the next higher mounting rail by using adjustment points on the array heads X See Figure 14 IMP...

Page 12: ...LCM Video Wall Series Installation Instructions 12 DIMENSIONS LCM2X2 72 83 1850 0 1 41 35 7 TO FRONT FACE OF ALUMINUM EXTRUSION 8 50 215 9 LCM2X2...

Page 13: ...368 3 9 05 229 8 0 13 3 2 C L OF SCREENS SHOWN WITH SIMULATED 42 SCREENS MAINTAIN SLIGHT GAP BETWEEN SCREENS COLUMNS SHOULD BE SPACED AT CENTER OR SLIGHTLY TO THE OUTSIDE OF CENTER AS SHOWN CENTER OF...

Page 14: ...LCM Video Wall Series Installation Instructions 14 DIMENSIONS LCM3X2 108 83 2764 4 6 80 172 7 LCM3X2...

Page 15: ...14 50 368 3 9 05 229 8 C L OF SCREENS SHOWN WITH SIMULATED 42 SCREENS MAINTAIN SLIGHT GAP BETWEEN SCREENS COLUMNS SHOULD BE APPROXIMATELY SPACED AT CENTER OF OUTSIDE SCREENS AS SHOWN CENTER OF GRAVIT...

Page 16: ...LCM Video Wall Series Installation Instructions 16 DIMENSIONS LCM3X2 continued DIMENSIONS LCM3X3 0 13 3 2 LCM3X2 108 83 2764 4 LCM3X3...

Page 17: ...14 50 368 3 9 05 229 8 C L OF SCREENS SHOWN WITH SIMULATED 42 SCREENS MAINTAIN SLIGHT GAP BETWEEN SCREENS COLUMNS SHOULD BE APPROXIMATELY SPACED AT CENTER OF OUTSIDE SCREENS AS SHOWN CENTER OF GRAVIT...

Page 18: ...LCM Video Wall Series Installation Instructions 18 DIMENSIONS LCM3X3 continued 6 80 172 7 0 13 3 2 LCM3X3...

Page 19: ...Installation Instructions LCM Video Wall Series 19...

Page 20: ...Franklinstraat 14 6003 DK Weert Netherlands P 31 0 495 580 852 F 31 0 495 580 845 Asia Pacific A Office No 1 on 12 F Shatin Galleria 18 24 Shan Mei Street Fotan Shatin Hong Kong P 852 2145 4099 F 852...

Reviews: