LCM2X1U / LCM2X1UP
Installation Instructions
8
TOOLS REQUIRED FOR INSTALLATION
PARTS
#2
3/32" (included)
1/8" (included)
5/32" (included)
3/16" (included)
1/2" or 13mm
C (4)
E (4)
[Interface Bracket Hardware Kit]
A (4)
M4x12mm
B (4)
M4x20mm
M4x25mm
D (4)
M5x12mm
M5x20mm
F (4)
M5x25mm
G (4)
M6x12mm
H (4)
M6x20mm
I (4)
M6x25mm
J (4)
M8x12mm
K (4)
M8x20mm
L (4)
M (8)
[Nesting spacer]
N (4)
[Universal
washer]
Q (1)
3/32"
S (1)
5/32"
R (3)
1/8"
T (1)
10-24 x 1/4"
U (2)
5/16" x 1"
V (2)
W (3)
5/16" x 3/4"
AA (1)
BB (1)
[Bottom coupling]
5/16"
[Bottom stop collar]
(Used with CPA Series
extension column system)
(Used with 1-1/2"
NPT column system)
Z (4)
10-24
CC (1)
[Ceiling mount
assembly - LCM2X1UP]
OR
DD (1)
[Back cover]
EE (4)
[Interface bracket-
LCM2X1UP]
OR
EE (4)
[Interface bracket-
LCM2X1U]
X (4)
10-24 x 2-1/4"
Y (4)
10-24 x 5/8"
CC (1)
[Ceiling mount
assembly - LCM2X1U]
(2 bags total - quantities listed per bag)
P (1)
3/16"
M8x30mm