Installation Instructions
FCA113
7
2.
Use #10-24 x 5/8" carriage bolt (E), #10-24 wing nut (L),
1/4" washer (F) and #10 washer (H) to secure locking tab
(K) to right wall bracket (B). (See Figure 5)
Figure 5
3.
Adjust depth of brackets depending on depth of CPU to
install. Remove four screws and nuts holding adjustment
screws in place and replace after desired depth is achieved.
(See Figure 6)
Figure 6
4.
Make all CPU connections and place CPU securely on
shelf.
5.
Use hook and loop strap (J) to secure CPU to shelf (C).
(See Figure 7)
Figure 7
Installing Fusion Mount to FCA113
1.
Use four 5/16-18 x 5/8" hex head bolts (D) and four 5/16"
washers (G) to secure Fusion rail mount to brackets (A and
B). (See Figure 8)
NOTE:
For some older Fusion models, four 5/16-18 X 3/4"
round head carriage bolts (P) and four 5/16" hex nuts
(Q) must be used to attach fusion mount to FCA113
using the square holes on FCA113 brackets. (See
Figure 8)
Figure 8
2.
Install display to Fusion mount following the Fusion mount’s
installation instructions.
(K)
(E)
(F)
(H)
(L)
(B)
(J)
(bottom view)
(D) x 4
(G) x 4
Fusion rail mount
(A)
(B)
(example)
square holes to use
with older models