background image

Top Newel Cap or
Handrail Landing Connector

If your balustrade ends at the top of the stairs, then you 
can finish off the newel with our Newel Cap (AXEVNC).  
However  if  you  have  balustrade  coming  off  the  top 
newel, typically at a 90

o

 angle (for return landings please 

see instructions below), then you can use our Landing 
Handrail Connector (AXEVLHC).

To  install  the  Landing  Handrail  Connector  simply  slide 
it  onto  the  top  newel  and  secure  using  the  30mm 
screw  provided,  making  sure  you  have  lined  it  up  with 
your landing baserail.  It is now ready for you to insert 
the  handrail  and  secure  using  the  two  30mm  screws 
provided (fig. 11).

The handrail can terminate to either a wall connector, or 
to another newel to handrail connector where there is a 
second flight of stairs.

Intermediate Newel on the Rake

If your staircase is longer than 3.9m (measured between 
inside newel faces) then you will require an intermediate 
newel for added strength.

This will require an additional newel base to be installed 
at the same time as the top and bottom bases, the cut 
off point for the intermediate newel base is 150mm.  The 
intermediate newel post must be cut to 590mm before 
fitting the collar and inserting it into the base.

Next  fit  the  intermediate  connector  (AXEVIC)  onto  the 
top of the newel and secure with the two 30mm screws 
provided.  Then slide the other half of the intermediate 
connector  onto  and  up  the  handrail,  once  located  into 
the newel connector, secure to the handrail by using the 
four 30mm screws provided.

Finally  secure  the  connector  assembly  by  inserting 
the  45mm  bolt  and  spacer  provided,  making  sure  the 
chamfered  end  goes  into  the  hole  first.  Finish  off  by 
inserting the cover cap into the bolt hole (fig. 12).

axxys

®

 evolution 

fitting instructions

www.axxys.co.uk

Summary of Contents for axxys evolution

Page 1: ...fitting instructions axxys evolution www axxys co uk...

Page 2: ...ed to suit any staircase pitch between 38o 45o Please Note Cheshire Mouldings axxys evolution is a factory pre finished system therefore when handling and installing please take extra care in order to...

Page 3: ...the stair string and front edge of the riser concerned and must be a minimum of 81x81xmm square if they measure less the sides will have to be built up using suitable material They must also have enou...

Page 4: ...Before you start slide the evolution newel post into the collar to make sure it fits snug If the newel is too tight the spigot on the bottom of the newel must be eased so it slides into the collar th...

Page 5: ...handrail Slide the connector onto the handrail and secure using the two 30mm screws provided Now loosly assemble the remaining half of the bracket using the bolt and two washers provided fig 6 Then w...

Page 6: ...cover over the baluster bracket the baluster assembly is now ready to be fixed on the hand base rails fig 9 All holes for fixing the baluster brackets should be pre drilled The bottom baluster should...

Page 7: ...l on the Rake If your staircase is longer than 3 9m measured between inside newel faces then you will require an intermediate newel for added strength This will require an additional newel base to be...

Page 8: ...found at the back of this booklet slide them into the elbow from either side and check that the handrails pass the screw holes Then pre drill and secure the handrails using the four screws supplied a...

Page 9: ...ate it any angle between 90o to 180o to suit a multitude of configurations First your intermediate Landing Newel must be installed using the dimensions from the earlier instructions for the Top Newel...

Page 10: ...notes www axxys co uk...

Page 11: ...axxys evolution 90o Elbow Template www axxys co uk...

Page 12: ...is a resistered trademark of Cheshire Mouldings Ltd Axxys Stair Balustrade is Available to Order Through Stairplan Ltd Hortonwood 1 Telford Shropshire TF1 7GN Phone 01952 216000 www stairplan com www...