New Newel Bases

Important;

Before removing any existing Newel Bases, please check to ensure they are non-structural.

If fitting new newel bases, they must be installed centrally to the stair string and front edge of the riser 

concerned (fig. 2 & 3).  Prior to fitting to the string, please follow the following instructions to cut down the 

newel bases to the correct height, ensuring you cut any excess from the bottom of the newel base.

Bottom Newel Base

Using the top edge line of the baserail that you marked on the newel base prior to cutting, now draw a 

vertical line up through the centre point of the newel base, making sure to intersect the baserail line.  Now 

measure up 175mm from the intersecting point and mark a horizontal line (fig. 2).  Then finally measure the 

remaining distance to the top of the newel and remove this from the bottom of the newel.

Top Newel Base

The top newel base should be marked out and cut in the same way as the bottom newel base, however the 
175mm dimension should be replaced with 125mm (fig. 3)

Newel Posts & Base Collar

Important;

Before you start, slide the evolution newel post into the collar to 
make sure it fits snug.  If the newel is too tight, the spigot on the 
bottom of the newel must be eased so it slides into the collar, this 
is done by using sandpaper to reduce the taper on the spigot.  
Please DO NOT try to force the newel post into the collar.  All 
drilling operations should be accurate, straight and level.

Newel Base Collar (AXEVBC) can now be fitted to the evolution 
newel, slide the collar onto the bottom spigot up to the stop, 
then pre drill and secure using fixings provided (fig. 4). 

For existing bases only

, find the centre of the newel base top 

by drawing diagonal lines from corner to corner and using the 
intersecting point, from the top and centre of the newel base, 
drill a hole 50mm diameter x 100mm deep (using our 50mm 
spur drill) to take the newel spigot (fig. 4).

Before  inserting  the  newel  post,  mark  and  cut  the  newel  to  a 
length of 565mm measured from the top of the spigot.  Once cut 
to length insert the newel post making sure the collar meets with 
the newel base, secure using a gap filling adhesive (fig. 4).

Repeat  this  step  for  the  top  newel  assembly,  but  the  newel 
must be cut to 750mm to the top of the spigot.

axxys

®

 evolution 

fitting instructions

www.axxys.co.uk

Summary of Contents for axxys evolution

Page 1: ...fitting instructions axxys evolution www axxys co uk...

Page 2: ...ed to suit any staircase pitch between 38o 45o Please Note Cheshire Mouldings axxys evolution is a factory pre finished system therefore when handling and installing please take extra care in order to...

Page 3: ...the stair string and front edge of the riser concerned and must be a minimum of 81x81xmm square if they measure less the sides will have to be built up using suitable material They must also have enou...

Page 4: ...Before you start slide the evolution newel post into the collar to make sure it fits snug If the newel is too tight the spigot on the bottom of the newel must be eased so it slides into the collar th...

Page 5: ...handrail Slide the connector onto the handrail and secure using the two 30mm screws provided Now loosly assemble the remaining half of the bracket using the bolt and two washers provided fig 6 Then w...

Page 6: ...cover over the baluster bracket the baluster assembly is now ready to be fixed on the hand base rails fig 9 All holes for fixing the baluster brackets should be pre drilled The bottom baluster should...

Page 7: ...l on the Rake If your staircase is longer than 3 9m measured between inside newel faces then you will require an intermediate newel for added strength This will require an additional newel base to be...

Page 8: ...found at the back of this booklet slide them into the elbow from either side and check that the handrails pass the screw holes Then pre drill and secure the handrails using the four screws supplied a...

Page 9: ...ate it any angle between 90o to 180o to suit a multitude of configurations First your intermediate Landing Newel must be installed using the dimensions from the earlier instructions for the Top Newel...

Page 10: ...notes www axxys co uk...

Page 11: ...axxys evolution 90o Elbow Template www axxys co uk...

Page 12: ...is a resistered trademark of Cheshire Mouldings Ltd Axxys Stair Balustrade is Available to Order Through Stairplan Ltd Hortonwood 1 Telford Shropshire TF1 7GN Phone 01952 216000 www stairplan com www...

Reviews: