![Cheminees Philippe RADIANTE 747 2V SR Installation & User Manual Download Page 28](http://html1.mh-extra.com/html/cheminees-philippe/radiante-747-2v-sr/radiante-747-2v-sr_installation-and-user-manual_2595892028.webp)
BA
CK PLA
TE, BAFFLE PLA
TE & GRA
TE ASSEMBL
Y 5.3
28
CHEMINÉES
PHILIPPE
RADIANTE 747 2V PR
STEP 3: FIRE GRATES & ASH RETAINER ASSEMBLY
1.
Insert the grate holder into the firebox base and bring towards the front (as illustrated below)
2.
Place the two grates to the left and right of the firebox directly above the ash pan
3.
Slide the ash pan into position at the base of the firebox
4.
Insert the ash retainer into the firebox and placing it within the front brackets
5.
Slide it forward until it inserts into the cleats and then position it into the slits (“holes of the base” as illustrated below)