Cheetah 64NEX Digital Video Router
Publication 81-9059-0685-0, Rev. A
March 2011
Proprietary Information of PESA
4-2
This equipment is designed for installation in a standard 19" equipment rack. Provide sufficient
space behind the equipment racks to allow for control, signal, power cables, and free airflow after
all cables are installed. Use all chassis mounting holes and tighten mounting hardware securely
by using the rack equipment manufacturer’s suggested torque settings.
Install the equipment into the rack as follows:
1.
Carefully, remove the equipment from the packing container and place the unit near the
rack where it will be installed.
2.
Insert the chassis into the equipment rack and support the bottom of the chassis while the
mounting hardware is being installed.
3.
Install the bottom two chassis mounting screws.
4.
Install the top two chassis mounting screws.
5.
Install any remaining chassis mounting screws.
6.
Tighten all of the chassis mounting screws until they are secure. Release/remove the
support from the bottom of the chassis.
4.4
C
ONNECTING
E
QUIPMENT
C
ABLES
Use the following guidelines when connecting equipment cables:
1.
Install the equipment in the rack before connecting cables.
2.
Relieve strain on all cables to prevent connector separation.
3.
To the extent possible, separate control, signal, and power cables to minimize crosstalk and
interference.
4.
Use as many cable ties as necessary to secure cables to the rack (see Figure 4-1). This will
minimize the amount of force transmitted to the equipment and help route cables away from
hazardous areas.
F
IGURE
4-1
Cables Attached to Supports
Summary of Contents for 64NEX
Page 66: ......