6.0
POWER SUPPLY REQUIREMENTS
6.1
General Details
The Power Supply Unit (PSU) is sold separately from the NS40 and NEO Controller.
The NEO Controller re24 Volts DC supplied at J6 or J14 of the EAS Sensor.
PSU which is suitable shall be an external AC/DC converter power supply rated at
24VDC nominal, with LPS either 50W or 90W maximum. LPS stands for limited power
source. Refer to Sourcing Spec (CKP P/N 10034493).
6.1.1
Approved PSU Model
Use only the approved power supply. The approved PSU is GS-599ES(R) (CKP P/N
7116509). This PSU can be installed with or without the "hood kit." It is the Technician's
responsibility to determine when the hood kit is required to meet national and/or local
code. Plenum PSU Installation (see section 6.1.2 below) is not typical, but can be
achieved as necessary to meet code.
Figure 2: 50W Power Supply
The region-specific IEC Power Cord is not included. For example, North America uses
the 3-prong AC cord type shown below. The "NA POWER CORD" is CKP P/N 7209892.
Note: You must purchase 1 region-specific AC Cord per 1 PSU.
Figure 3: IEC Cord (Not Included)