![Check Point QUANTUM 600-M Manual Download Page 9](http://html1.mh-extra.com/html/check-point/quantum-600-m/quantum-600-m_manual_2594897009.webp)
Procedure for Smart-1 600-M Appliances
Quantum Smart-1 600-M/6000-L/6000-XL Appliances Replacing Line Cards | 9
Procedure for Smart-1 600-M Appliances
Use the relevant install or replace workflow for your appliance. For each step in the workflow, follow the
instructions as described in the subsequent sections of this guide.
To install a new expansion line card :
1.
Prepare the appliance.
2.
Remove the riser.
3.
Install a new expansion line card into the riser.
4.
Install the riser.
5.
Reassemble the appliance.
6.
Install a transceiver.
To replace an existing expansion line card:
1.
Prepare the appliance.
2.
Remove the riser.
3.
Remove the existing expansion line card from the riser.
4.
Install a new expansion line card into the riser.
5.
Install the riser.
6.
Reassemble the appliance.
7.
Install a transceiver.
Preparing the Appliance
1.
Make sure to follow the
"Safety Instructions" on page 5
2.
Shut down the appliance:
n
In Gaia Portal:
Go to
Maintenance
>
Shut Down
, and click
Halt
.
n
In Gaia Clish:
Run:
halt
3.
Open the retention strap that secures the power cables to the PSUs.
4.
Disconnect the power cables from the AC PSUs.
5.
Remove the hook-and-loop straps that hold and secure the system cables, if they interfere with the
PSU removal.
6.
Remove the appliance from the rack.
See the
Installing the Quantum Smart-1 600-M Telescopic Rails
guide.