Procedure for Smart-1 6000-L/6000-XL Appliances
Quantum Smart-1 600-M/6000-L/6000-XL Appliances Replacing Line Cards | 14
Procedure for Smart-1 6000-L/6000-XL
Appliances
Use the relevant install or replace workflow for your appliance. For each step in the workflow, follow the
instructions as described in the subsequent sections of this guide.
To install a new expansion line card:
1.
Prepare the appliance.
2.
Install a new expansion line card into the riser.
We recommend that you populate the bottom-most slot first.
3.
Reassemble the appliance.
4.
Install a transceiver.
To replace an existing expansion line card:
1.
Prepare the appliance.
2.
Remove the existing expansion line card from the riser.
3.
Install a new expansion line card into the riser.
4.
Reassemble the appliance.
5.
Install a transceiver.
Preparing the Appliance
To prepare the appliance:
1.
Make sure to follow the
"Safety Instructions" on page 5
2.
Shut down the appliance:
n
In Gaia Portal:
Go to
Maintenance
>
Shut Down
, and click
Halt
n
In Gaia Clish:
Run:
halt
3.
Open the retention strap that secures the power cables to the PSUs.
4.
If AC PSUs are installed in the appliance:
Disconnect the power cables from the AC PSUs.
5.
If DC PSUs are installed in the appliance:
Disconnect the safety ground wires from the DC PSUs.