NOTE: ALL ELECTRICAL WORK MUST BE DONE BY A QUALIFIED ELECTRICIAN

Single phase hookup

1. 6 single tap terminals for positive (do not jump terminals)

2. Ground wires go here (terminals are already jumped together)

3. All neutral wires should be attached here (terminals are already jumped together)

4. All three of these terminal taps must have power to operate (jumpers may be necessary).

Three phase hookup

5. 6 single tap terminals for positive (do not jump terminals)

6. Ground wires go here (terminals are already jumped together)

7. All neutral wires should be attached here (terminals are already jumped together)

8. All three of these terminals must have one phase of electric.

Drawing B

1

2

3

4

Drawing B

5

6

7

8

Drawing A

H O TO U T P U T

GROUND     NEUTRAL

H O TI N P U T

H O TO U T P U T

GROUND     NEUTRAL

H O TI N P U T