
www.charltonandjenrick.co.uk
23
LT6541 (ISS 11)
Load 6 off of the 1.5 v “C” batteries into the holder provided and insert into heat shield pouch with the metal
support plate on top. Locate the battery holder within the fire on the bottom right hand side and as far
forward to the front of the firebox.
Position the fascia so that it is central over the top flange of the combustion box fitting back against the
firebox using the magnets provided.
SECTION ELEVEN Check Operation of Fire (installation instructions)
CHECK BURNER PRESSURE AND GENERAL OPERATION
Remove the screw from the pressure test point on the burner inlet elbow and fit a pressure test gauge.
Turn on the gas to the appliance and operate as described in section three. Check that the inlet pressure
/- 1 mbar for natural gas & /-1 mbar for L.P.G.
Turn off the appliance and remove pressure test gauge.
Refit the screw into the pressure test point and turn on the appliance again, check that the screw has sealed
with leak detection fluid.
Turn the appliance off.
Refit the outer fascia.
BATTERY POSITION
Summary of Contents for infinity 890 BF
Page 28: ...28 LT6541 ISS 11 ...
Page 29: ...www charltonandjenrick co uk 29 LT6541 ISS 11 ...