RT125 Operator’s Manual
Specifications - 199
Power Plant
U.S.
Metric
Engine: Deutz
®
Tier 4 Final TCD3.6L4 diesel, direct injection, 4 cyl. turbocharged with charge air
cooling and exhaust after treatment system (EAT).
Displacement
221 in
3
3.6 L
Bore
3.86 in
98 mm
Stroke
4.72 in
120 mm
Engine manufacturer’s gross power rating per SAE J1349
121 hp
90 kW
Estimated net power per SAE J1349
113 hp
84 kW
Rated speed
2300 rpm
2300 rpm
Maximum engine tilt angles*
Longitudinal
30°
30°
Lateral
30°
30°
*Exceeding these operating angles will cause engine damage. This DOES NOT IMPLY machine is
stable to maximum angle of safe engine operation.
Hydraulic System
U.S.
Metric
Ground drive pump capacity at 2300 rpm
27.5 gpm
104 L/min
Ground drive pump relief pressure at 2300 rpm
5300 psi
365 bar
Attachment pump capacity at 2300 rpm
45 gpm
180 L/min
Attachment pump relief pressure at 2300 rpm
6500 psi
448 bar
Auxiliary pump capacity at 2300 rpm
5.1 gpm
19.3 L/min
Auxiliary pump relief pressure at 2300 rpm
3000 psi
206 bar
Steering pump capacity at 2300 rpm
8.6 gpm
32.5 L/min
Steering pump relief pressure at 2300 rpm
3000 psi
206 bar
Fluid Capacities
U.S.
Metric
Fuel tank
38 gal
144 L
Engine oil
8.5 qt
8 L
Hydraulic reservoir
25 gal
95 L
Hydraulic system
30 gal
114 L
Cooling system
4.25 gal
16.1 L
DEF tank
2.6 gal
10 L
Summary of Contents for Ditch Witch RT125
Page 1: ...RT125 Operator s Manual 1 Issue 2 1 Original Instruction 053 2942...
Page 7: ...Overview 6 RT125 Operator s Manual About This Manual...
Page 29: ...Safety 28 RT125 Operator s Manual Attachment Safety Alerts...
Page 73: ...Operation Overview 72 RT125 Operator s Manual Leaving Jobsite...
Page 81: ...Prepare 80 RT125 Operator s Manual Check Supplies and Prepare Equipment...
Page 87: ...Drive 86 RT125 Operator s Manual Shut Down...
Page 99: ...Transport 98 RT125 Operator s Manual Retrieve...
Page 107: ...Backhoe 106 RT125 Operator s Manual Finish Job...
Page 118: ...RT125 Operator s Manual Saw 117 Saw Chapter Contents Set Up 118 Operate 119 Finish Job 121...
Page 123: ...Saw 122 RT125 Operator s Manual Finish Job...
Page 131: ...Plow 130 RT125 Operator s Manual Finish Job...
Page 197: ...Service 196 RT125 Operator s Manual As Needed...
Page 217: ...Specifications 216 RT125 Operator s Manual Declaration of Conformity Information...
Page 220: ......
Page 221: ......
Page 222: ...RT125 Operator s Manual Service Record 221 Service Record Service Performed Date Hours...
Page 223: ...Service Record 222 RT125 Operator s Manual Service Performed Date Hours...
Page 224: ...RT125 Operator s Manual Appendix 223 Appendix Chapter Contents Engine Diagnostic Codes...