RT125 Operator’s Manual
Reel Carrier - 115
Set Up
6.
After installing arbor, latch retainers
(shown).
Prepare to Plow
1.
Fasten and adjust seat belt.
2.
Start tractor. See page 82 for start-up procedures.
3.
Drive to beginning of planned plow path. See page 83 for driving procedures.
4.
Set parking brake and verify parking brake indicator is on.
5.
Lower backfill blade, if equipped.
NOTICE:
Large reels of conduit or cable may obstruct the forward visibility of the operator.
Machines with limited forward visibility should be driven only for short distances and with the
help of a spotter.
t48om056w.eps
Summary of Contents for Ditch Witch RT125
Page 1: ...RT125 Operator s Manual 1 Issue 2 1 Original Instruction 053 2942...
Page 7: ...Overview 6 RT125 Operator s Manual About This Manual...
Page 29: ...Safety 28 RT125 Operator s Manual Attachment Safety Alerts...
Page 73: ...Operation Overview 72 RT125 Operator s Manual Leaving Jobsite...
Page 81: ...Prepare 80 RT125 Operator s Manual Check Supplies and Prepare Equipment...
Page 87: ...Drive 86 RT125 Operator s Manual Shut Down...
Page 99: ...Transport 98 RT125 Operator s Manual Retrieve...
Page 107: ...Backhoe 106 RT125 Operator s Manual Finish Job...
Page 118: ...RT125 Operator s Manual Saw 117 Saw Chapter Contents Set Up 118 Operate 119 Finish Job 121...
Page 123: ...Saw 122 RT125 Operator s Manual Finish Job...
Page 131: ...Plow 130 RT125 Operator s Manual Finish Job...
Page 197: ...Service 196 RT125 Operator s Manual As Needed...
Page 217: ...Specifications 216 RT125 Operator s Manual Declaration of Conformity Information...
Page 220: ......
Page 221: ......
Page 222: ...RT125 Operator s Manual Service Record 221 Service Record Service Performed Date Hours...
Page 223: ...Service Record 222 RT125 Operator s Manual Service Performed Date Hours...
Page 224: ...RT125 Operator s Manual Appendix 223 Appendix Chapter Contents Engine Diagnostic Codes...