20016967
7
GB
3.4
GAS TRAIN,
(as EN 676)
The gas train is supplied separately, for its adjustment see the enclosed instructions.
3.5
GAS TRAIN ELECTRICITY SUPPLY
The gas train’s power cables can be fed to the right or
left of the burner, as illustrated in figure 6.
Depending on the entry point, the cable clamp with
pressure test point (1) and simple cable clamp (2) may
need swapping over.
Consequently, you must make sure:
³
the cable clamp (1) is positioned correctly;
³
the tube is positioned correctly so that there are no
restrictions likely to impede air flowing to the pres-
sure switch.
WARNING
If necessary, cut the tube to the right size.
3.6
GAS FEEDING LINE
GAS TRAIN
MATCHED BURNER
CONNECTIONS
USE
TYPE
INLET
OUTLET
MBC 65 DLE
TIGRA 2 CG510
Rp 1 / 2
Flange 1
Natural gas and LPG
MBDLE 405 B01
Rp 1 / 2
Flange 1
Natural gas and LPG
MBC 65 DLE
TIGRA 2 CG710
Rp 1 / 2
Flange 2
Natural gas
≤
70kW and LPG
MBDLE 405 B01
Rp 3 / 4
Flange 2
Natural gas and LPG
MBDLE 407 B01
Rp 3 / 4
Flange 2
Natural gas and LPG
MBDLE 407 B01
TIGRA 2 CG1210 1A
TIGRA 2 CG1810 1A
Rp 3 / 4
Flange 3
Natural gas
≤
150kW and LPG
MBDLE 410 B01
Rp 1 1 / 4
Flange 3
Natural gas and LPG
MBDLE 412 B01
Rp 1 1 / 4
Flange 3
Natural gas
2
1
2
1
Fig. 6
D7113
1
– Gas supply pipe
2
– Manual cock
(charged to the installer)
3
– Gas pressure gauge
(charged to the installer)
4
– Filter
5
– Gas pressure switch
6
– Safety
valve
7
– Pressure
governor
8
– Adjusting
valve
M1
– Gas-supply pressure test point
M2
– Pressure coupling test point
M2
Fig. 7
D5209
1
2
3
M1
5
6
7
4
8
D7279
6
7
8
MBC 65 DLE