background image

Installation

THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY

PART NO. 1000629

8

Remove nuts from the (4) studs.
Install the Slope Top.
Open Door or Doors on top units and place slope top on the
aligning holes. 
Install locking nuts and secure to cabinet.

3.

Summary of Contents for SVPRO Series

Page 1: ...O SERIES QUESTIONS Phone 866 391 4200 8 AM 5PM PST Monday Friday The following instructions will provide you with a guide for installation and usage for the SVPRO Series cabinets If at any time you ne...

Page 2: ...THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY PART NO 1000629 2 Table Of Contants Before You Begin 3 Installation Site Prep 4 Installation 7 Proper Use 11 Lock Use 12 Warranty 12 Proper Care Safety 12...

Page 3: ...7700 Only use the provided hardware during assembly Read and understand the entire installation instructions prior to beginning the install 1 2 3 THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY PART NO...

Page 4: ...ommended pad size for one two and three units A single unit template is available for purchase if needed part 4003551 Locker Base Drill Template Install 4 3 8 X 3 3 4 Concrete Wedge Anchors not includ...

Page 5: ...THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY PART NO 1000629 Site Prep Double Locker Pad 5...

Page 6: ...THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY PART NO 1000629 Site Prep Triple Locker Pad 6...

Page 7: ...structions for the SVP3 Note All locker doors must be locked while moving If your locks are not installed before setting the unit in place make sure the zip ties are in place to prevent the door from...

Page 8: ...ENT IS CONFIDENTIAL AND PROPRIETARY PART NO 1000629 8 Remove nuts from the 4 studs Install the Slope Top Open Door or Doors on top units and place slope top on the aligning holes Install locking nuts...

Page 9: ...s as shown in Detail A Use touch up paint to cover bare metal after knock outs are removed Postion the cabinets in place with the doors in the open position Ganging Hardware Kit requirred 1 per pair o...

Page 10: ...orlift operator Lift the unit from the shipping pallet and position on the pad Secure the unit to the pad see Step 2 Gang the unit the the ajoining cabinets see step 4 Install the Slope Top see Step 3...

Page 11: ...IS CONFIDENTIAL AND PROPRIETARY Proper Use 750lb MAX 750lb Max load per locker bay Do not drop items into drawers damage may occur Do not use shelves as a step or seat injury or damage may occur PART...

Page 12: ...applies to Champion Tool Storage manufactured Professional Series Modular Series Flight line Series and Military Our warranty excludes damage caused by misuse abuse modifications to the unit or the us...

Reviews: