Installation
THIS DOCUMENT IS CONFIDENTIAL AND PROPRIETARY
1.
Use a forklift or pallet jack to move the following Models
into place, SVP2, SVP5, and SVP8.
Remove all packaging.
Set the unit on the pad and align the holes over the studs in
the Concrete Pad.
See Step 5 for installation instructions for the SVP3.
Note,
All locker doors must be locked while moving.
If your locks
are not installed before setting the unit in place, make sure
the zip ties are in place to prevent the door from opening
while moving.
2.
PART NO. 1000629
7
Open the lower locker doors by cutting the temporary zip
tie in the lock hasp hole.
Remove the false floor from the locker.
Using a socket wrench, 6" extension, and deep well 9/16"
socket, install the anchor washer and nut.
Install the false floor.