background image

201108 - POwER STATiON PARALLEL KiT

ASSEMbLY AND OPERATiON

8

ASSEMbLY AND OPERATiON

This parallel kit is intended for use with Champion Power 
Equipment Power Stations. Please refer to your Power Stations 
Operator’s Manuals for safety rules, start up and shut down 
procedures, specifications, and troubleshooting.

The total output of this kit will depend on the rated wattage of 
the Power Stations connected to it. The maximum output of the 
parallel kit is the amperage rating of the circuit breakers.

Paralleling Two Power Stations

1.  Ensure both Power Stations are turned off and all electrical 

loads are disconnected before installing parallel kit.

2.  Lift open the parallel kit storage cover and remove the cables. 

3.  Place the parallel kit on top of the heaviest Power Station 

being paralleled so that the handles on the Power Station fit 
securely into the slots on the bottom of the parallel kit.

4.  Place the second Power Station on top of the parallel kit so 

that the Power Stations feet fit securely into the slots on top 
of the parallel kit.

5.  Lift Power Stations AC input side cover and insert the RED 

power lead into the RED receptacle and the BLACK power 
lead into the BLACK receptacle.

Summary of Contents for Para LINK 201108

Page 1: ...re operating the product Failure to do so could result in serious injury This manual should remain with the product Specifications descriptions and illustrations in this manual are as accurate as know...

Page 2: ...TABLE OF CONTENTS Introduction 3 Safety Definitions 3 Important Safety Instructions 4 Safety Symbols 5 Controls and Features 7 Control Panel 7 Assembly and Operation 8 Paralleling Two Power Stations 8...

Page 3: ...fort has been made to ensure the accuracy and completeness of the information in this manual at the time of publication and we reserve the right to change alter and or improve the product and this doc...

Page 4: ...serve all ratings on the parallel kit and accessory products you intend to use CAUTION This device is intended for temporary use outdoors and reasonable care should be exercised when using this device...

Page 5: ...ked to comply with ANSI Z87 1 Ground Consult with local electrician to determine grounding requirements before operation Electric Shock Failure to use in dry conditions and to observe safe practices c...

Page 6: ...t Important Safety Instructions 6 SYMBOL MEANING Open Flame Alert Keep away from fuel smoking open flames sparks pilot lights heat and other ignition sources Wet Conditions Alert Do not operate parall...

Page 7: ...1 Circuit Breakers Push Reset Protects the generator against electrical overloads 2 Power Indicator Illuminates green when power is being supplied to the parallel kit RECEPTACLES A t 120V AC 30A RV NE...

Page 8: ...s Paralleling Two Power Stations 1 Ensure both Power Stations are turned off and all electrical loads are disconnected before installing parallel kit 2 Lift open the parallel kit storage cover and rem...

Page 9: ...Stations up to the receptacles rated amperages Never exceed the specified rated capacity of the receptacle 9 Turn off and unplug connected devices before turning the Power Stations off CAUTION Do not...

Page 10: ...n not in use neatly wrap the cables and store them in the parallel kit s storage compartment SPECIFICATIONS Specifications Model 201108 Volts AC 120 Frequency 60 Hz Phase Single Weight 4 3 lb 1 97 kg...

Page 11: ...part or the equipment as a whole Installation Use and Maintenance This warranty will not apply to parts and or labor if the product is deemed to have been misused neglected involved in an accident abu...