DRIVE RELEASE MECHANISM  
(MANUAL OPERATION) 

 
The drive is equipped with a lockable release 
mechanism to enable the gate to be operated 
manually during a power out.  
Open Door 
1.  Open lock with key 
2.  Push on lock to open 
3.  Turn opening lever into position 
 
Disengage gear: 
Turn knob fully inside (clockwise). 
 
Engage gear: 
Turn knob outside (anti-clockwise).  
 
Notice: For full engagement of gear it is important to 
turn the knob completely outside (anti-clockwise). 
 

FITTING LIMIT SWITCHES (TO GATE)  

  The drive should be disengaged before this part of 

the assembly work is carried out.  

  Slide the gate into the closed position.  

  Mount the limit switch bracket such that the roller of 

the first switch is situated approximately in the 
middle of the bracket. Repeat this process for the 
open position. The bracket must be mounted with 
screws immediately. 

 

INITIAL OPERATION 
 

Check gate functionality manually when the drive has 
been disengaged. Electrical operation is possible 
only if a controller (CB400) is connected. 

 
ELECTRICAL CONNECTION: 

See electrical wiring diagram with control board 
CB400 

 

Control board pre-installed 

 

Limit switch pre-wired to NC contacts  

 

Motor pre-wired to control board box 

 

Control board box pre-installed 

 
 
Always ensure that the mechanical and electrical 
safety requirements relevant to the given system are 
complied with. A sliding gate can also be secured by 
implementing on-site measures (fence, wall, etc.). 

 

 
 
MAINTENANCE WORK (monthly) 

The drive mechanics are generally maintenance-free. 
Check at regular intervals that the gate hardware and 
the drive are all firmly in place.   

 

Disengage the drive and check gate functionality. 
Only an easy-running gate will work well with a 
drive. A drive is no substitute for a poorly 
functioning gate. 

 

Inspect for oil leakage on gear box. 

 

Inspect for damage to electrical wiring 

Summary of Contents for LiftMaster Professional SLY2500

Page 1: ...SLIDING GATE OPERATOR Installation SLY2500 For gates up to 2 500kg www liftmaster de Email info chamberlain de Chamberlain GmbH Alfred Nobel Strasse 4 D 66793 Saarwellingen Germany 11 2008 b ...

Page 2: ...round deformation etc High outdoor temperatures can lead to premature initiation of temperature protection switch Notice Motors are not designed to run permanent run continuous operation Outside temperature and gate represent important parameters for actual operating duration Attention This product may only be installed from professional installers Only qualified and trained electricians may conne...

Page 3: ...cm wide x 100cm deep Notice Precisely determine the height of the plinth motor mounting socket and the distance from the gate prior to installation You are advised to work as precisely as possible MOUNTING MOTOR AND GEAR UNIT The weight of the gate should not be borne by the cog wheel Position the drive via the adjustment holes such that its location vis à vis the rack bar complies with the instal...

Page 4: ...d with screws immediately INITIAL OPERATION Check gate functionality manually when the drive has been disengaged Electrical operation is possible only if a controller CB400 is connected ELECTRICAL CONNECTION See electrical wiring diagram with control board CB400 Control board pre installed Limit switch pre wired to NC contacts Motor pre wired to control board box Control board box pre installed Al...

Page 5: ...99 5 EG Declaration of Incorporation Automatic Gate Opener Models when installed and maintained according to all the Manufacturer s instructions in combination with a Gate which has also been installed and maintained according to all the Manufacturer s instructions meets the provisions of EU Directive 89 392 EEC and all amendments I the undersigned hereby declare that the equipment specified above...

Page 6: ...CONTROL BOARD KIT CB400 for AC SLIDING GATE OPERATORS Installation Instructions www liftmaster de Email info chamberlain de Chamberlain GmbH Alfred Nobel Strasse 4 D 66793 Saarwellingen Germany ...

Page 7: ... the relevant electrical regulations are trained in the use and care of appropriate safety equipment are capable of recognising the dangers associated with electricity Scope of these instructions These instructions describe the installation and options for the product CB400 control board AS210B Some features require the optional ZM SKS plug in logic board to work This manual should only be used to...

Page 8: ...requires ZM SKS B plug in card IMPORTANT BEFORE the installation of control board make sure it is checked if your control motor requires to be set for 400Volt 3 Phase or 230Volt 1 Phase X4 terminal A Test button OPEN direction S01 A Test button CLOSE direction S02 X1 Terminals Mains X2 Terminals Motor safety circuit of drive X3 Terminals Command devices X4 Terminals Selection 230V 400V X5 Terminal...

Page 9: ...ps 1 Remove cover of operator 2 Remove control board box cover 3 Compare general pre assembly of control board Picture 1 230Volt 1 Phase motor assembly Picture 2 400Volt 3 Phase motor with motor protection switch installed 4 Install the control board holders 4 pieces into the marked holes See picture 3 Pic 1 Pic 2 Pic 3 ...

Page 10: ...ty switch emergency manual operation NC contact T1 Transformer X1 Terminal block for mains connection X2 Terminal block for motor X4 Terminal block for mains voltage selection 1 2 230Volt 2 3 400Volt Picture of general wiring 400Volt shows Connection to motor via motor protection switch Limit switch connected right side Ground wire connected to board Not shown Connect mains to L1 L L2 L L3 L PE PE...

Page 11: ...Safety switch emergency manual operation normally closed contact T1 Transformer X1 Terminal block for mains connection X2 Terminal block for motor X4 Terminal block for mains voltage selection Picture of general wiring 1 Phase 230Volt motor Connection to motor via motor protection switch Limit switch connected right side Ground wire connected to board Not shown Connect mains to L2 L 230Volt L1 N N...

Page 12: ... switch OPEN Terminal block X3 Safety Devices and Commands 14 15 STOP Input 12 13 OPEN Direction Input 10 11 CLOSE Direction Input 7 8 9 Safety Edges Closed Direction Requires the ZM SKS module 5 6 Output 24Volt DC max 150mA 5 6 3 4 Radio input Automatic operation Requires the ZM SKS module 1 2 Photocell Close connection Requires the ZM SKS module EXAMPLE OPEN STOP CLOSE 4 lead solution EXAMPLE OP...

Page 13: ...ology Closing direction Terminal 5 24Volt Terminal 6 Ground Terminal 2 Signal Notice A 4 wire photocell requires a jumper to be added 5 For relay photocell with 4 wire technology OPENING direction Terminal 14 15 Signal Terminal 5 24VDC Terminal 6 24VDC MORE OPTIONS For Chamberlain 2 wire photocells the optional 600213 2 interface box is required Three more photocells or safety edges may be connect...

Page 14: ...J3 must be inserted X7 Socket Socket for the ZM SKS plug in board If the terminal is not used by the module the jumper marked J5 must be inserted X10 Socket Terminal for press and release full open and full close Opening direction J1 Closing direction J2 J1 and J2 jumper OPEN if ZM SKS board is used J1 and J2 jumper CLOSED if not connected WARNING If jumper J2 is inserted the safety edge output do...

Page 15: ...ts Potential free normally open contact min 10 mA max 230V AC 4A Contacts used once for power switching can not be subsequently used for connecting small currents Temperature range In operation 10 C 45 CIn storage 25 C 70 C Air humidity up to 80 not condensing g k 8 1 x o r p p a t h g i e W Guidelines Standards Declaration of Conformity Gate Control Board for SLY2500 and 3500 AS210B is in conform...

Reviews: