![Challenger HQ006 Installation And Operation Manual Download Page 13](http://html1.mh-extra.com/html/challenger/hq006/hq006_installation-and-operation-manual_2586201013.webp)
QAD#IM6010 RevD 11.01.19
Tools
1 Metric Allen Key (Hex Wrench)
1 Screw Driver
1 Metric Spanner
1 Wrench 200mm
1 Wrench 300mm
1 Wire Stripper Long Nose
1 Multi Meter (AC, DC, Resistance)
1 DC Signal Generator (4 ̴-20mA): PCU Board Option
1mA Meter (0 ̴25mA): PCU & CPT Board Option
MAINTENANCE
Caution:
Turn off all power services before attempting to perform a service on the actuator. POTENTIAL HIGH PRESSURE
VESSEL. Before removing or disassembling the actuator ensure the valve or other actuated devices are isolated and not under
pressure.
Maintenance under normal conditions at six month intervals, however when conditions are more severe, more frequent
inspections may be advisable.
Ensure valve actuator alignment
Ensure wiring is insulated, connected and terminated properly
Ensure all screws are present and tight
Ensure cleanliness of internal electrical devices
Ensure conduit connections are installed properly and are dry
Check internal devices for condensation
Check power to internal heater
Check enclosure O-ring seals and verify the O-ring is not pinched between flange
Verify declutch mechanism
Visually inspect during open /close cycle
Inspect identification labels for ware and replace if necessary
Warning:
Treat cover with care. Gap surfaces must not be damaged or dirtied in any way. Do not jam cover during fitting.
13