Models CL4P9S & CL4P9X
Installation, Operation and Maintenance
6
Rev 12/28/09
Q4P09-IOM-A.doc
4) Check the lock clevis to ensure it is secure and
that the lock pawl is in the correct position as
shown in
Fig 4
. Adjust the clevis if necessary.
Fig 4 – Lock Clevis
C
OLUMNS
5) Disassembly each column assembly place the
columns close to each corner per layout
(column with the power unit bracket goes at
the front left column per
Fig 1
).
6) With the runways spaced per
Fig 1
, lay the
cross beams on the runway per
Fig 5
below.
Place cardboard between the runway and
cross beam. Slide the column over the ends of
the slide blocks on the cross beam. Repeat for
each column.
Fig 5 – Column/Cross Beam Assembly
7) With help, stand up the front and rear
column/cross beam assemblies.
R
UNWAY
L
AYOUT
Fig 8 –
Power Runway 4-Stack
(rear view)
8) Position runways on blocking
(see Fig 9)
per
layout lines established in step 1. Use four 30”
long 4x4’s spanning the width of the runway
and four 12” long 1x4’s to shim up the jack-rail
side of the runway. Cable #1 & #2 should be
extending out from the rear of the power
runway and cable #3 & #4 from the front of the
power runway,
Fig 9
.
9) Position the front and rear cross beams,
Fig 9
.
Fig 9 –
Runway Layout