15
principal 210--8).
3, select the proper electric circuit trace according to the local request.
Please install the socket near the steam generator if it is necessary.
The current load of plug and socket should be more than 250V. After
the sealing wall, the machine and the controller’s wiring can be done.
4, release the screw and open the top. Open the power leading-in blind
via in the right side of the machine.Connect in strict accordance with
the wiring method on the power wiring diagram label (the wiring
diagram label is on the chassis cover). The machine can be turned on
after the installation controller.
Check terms
Please check the machine under these terms before using it
1, make sure the machine connect earth, and the earth wire’s width
should wider than 4mm
2
。
2
,
check if the model is proper, if not, the shower room will not reach
the highest temperature.
3, choose the proper steam generator (220V or 380V). The heater and
the board will be damaged if 380V were connected to the 220V
steam generator. The power will reduce 25% if 220V were
connected to 380V steam generator. Zone line of 380V’s steam
generator must be connected rightly, that is zone line can not
connect phase, or the heater and board will also be damaged.
4, the steam generator must be stalled vertically.
5, choose right cable and circuit breaker.
Warnings;
·
Turn off all the power before stall and maintain the machine.
·
Do not add additional wires and power to the machine. Make sure