16
3.4 EBM Installation (Optional)
Connecting the EBM in Tower form:
1.
Position the UPS and EBM within the extended UPS stands then slide the
stands to either end of the tower.
2.
Tighten the screws on the UPS cover for stabilisation.
3.
Connect an Earth line from the UPS (port A) to the EBM (port B)