Technical instructions for the commissioning and adjustment
8
Figure 1a. Connection scheme of the boiler EKO-CK P 70, 90 and 110 with in-built Cm Pelet-set
90 on heating installation with stainless steel hot water boiler:
1.
Boiler
EKO-CK P 70, 90,110
with in-built Cm Pelet-set 90
2. Stainless steel hot water boiler
TB
3. Air-vent group
4. Heating system pump
5. Non-return valve
6. Manual 4-way mixing valve
7. Sanitary water pump
8. Sanitary water sensor
9. Expansion vessel
(10% volume of water in the installation)
Figure 1b. Connection scheme of the boiler EKO-CK P 70, 90 and 110 with in-built Cm Pelet-set
90 on heating installation with accumulation tank:
1. Boiler
EKO-CK P 70,90 ,110
with in-built Cm Pelet-set 90
2. Accumulation tank (CAS)
3. Heating pump between boiler and accumulation tank (CAS)
4. Sanitary water sensor (at the lowest sensor sleeve on the accumulation tank
5. 3-way thermostat valve for outlet protection (as ESBE VTC 512, VTC 531, LTC 141 or Laddomat 21)
or 3-way mixing valve with actuator and return flow temperature sensor
6. Air-vent group
7. Expansion vessel
(10% volume of water in the installation)
4.2. Installation of CPSP-800 pellet tank and CPPT-90 pellet feeder
See Technical instructions for installation, use and maintenance of pellet tank and feeder supplied with
CPSP-800 pellet tank and CPPT-90 screw feeder.