GB
8. Taking out of service
8.1 Taking out of service after expiry of
the ADR approval
After expiry of the ADR approval of 5 years after
the date of manufacture. Thereafter, filling stations
may be used again in accordance with regulation
ADR 1.1.3.1 c (see point 1.2.2 of these operating
instructions).
Important!
As the approval number is no longer valid,
it must be made unrecognisable on the
type plate of the tank.
To this end, you can use the adhesive text label
enclosed with the tank documentation on the
KSMobil Easy. Cut out a text block in the language
of your choice (German/English/French) and stick it
over the approval number on the type plate
.
i
7. Maintenance and inspection
7.1 Safety measures
Important!
The operator must provide any protective
clothing that may be required.
Normal maintenance work may be carried out by
operational personnel.
Important!
Inspections of the filling stations with ADR
approval may only be performed by
specially trained personnel.
Ask the manufacturer about these training courses.
i
i
7.2 Maintenance and inspection table
Interval
Assembly
Action
As
required
Outside of
filling
station
Clean off any stuckon
dirt or petrol.
Filter
insert
Clean coarse dirt off
the filter insert at filling
connection
The filter
insert must not be
dismantled!
Monthly
Container
Visual check for damage.
Piping
system
Check hoses for cracks
and porosity, check
fittings for leaks (replace
defective parts).
Annually
Moving
parts of the
tank
Lubricate hinges with a
few drops of universal oil.
Every 2.5
years
Filling
station
Inspection by experts
with:
Documentation in test
report
If test is successful:
Make entry on type
plate with waterproof
pen.
(Month/year e.g. 01/14)
Every 5
years
Filling
station
Complete verification
years by manufacturer
CEMO or an authorised
partner.
Documentation in test
report
i
Important!
Always keep filling station in a
usable condition.
F
GB
D
1
2
26
Summary of Contents for KS-Mobil Easy 120l
Page 100: ...100 12 Zertifikat TÜV Süd TÜV Süd Certificate D ...
Page 101: ...101 GB ...
Page 102: ...102 13 Konformitätserklärungen Pumpen Declarations of Conformity Pumps D ...
Page 103: ...103 GB ...
Page 105: ...105 ...
Page 106: ...106 14 BAM Zulassungsscheine BAM approval certificates GB D ...
Page 107: ...107 GB D ...
Page 108: ...108 GB D ...
Page 109: ...109 GB D ...
Page 110: ...110 GB D ...
Page 111: ...111 GB D ...