Cembre LD-2ENY Operation And Maintenance Manual Download Page 7

6

3.5.2) "MPAF..." SPECIFIC RAIL SHOES
Suitable for positioning the drill on running and guard 
rails.
Enable the automatic position of the machine onthe drilling axis 
(H) of each specifi c rail.

 Note: Please contact

 Cembre 

for other types of rail.

RAIL SHOES DRILLING ON GUARD RAILS 

RAIL SHOES DRILLING ON RUNNING RAILS

RAIL SHOES DRILLING ON GIRDER RAILS

H

H

(*) to be used with PFA 1 arbour extension and PPL5 Pilot Bit.

100 LB ARA-B 

2 1/4”

112/115/119 LB RE  2 5/8”
115 LB-RE-3132  

3 1/32”

132 LB RE 

3 9/32”

136 LB RE 

3 1/4”

MPAF 100 LB ARA-B GR
MPAF 115/119 LB RE GR
MPAF 115 LB-RE-3132
MPAF 132 LB-RE-3932
MPAF 136 LB-RE-314

RAIL SHOE

(Using DBG-GR clamp)

TYPE OF 

RAIL

H

(inches)

128/149 LB  

3”

128/149 LB 

2 3/4”

149 LB 

2 3/4”

GGR 118 

2 3/8”

RI60/RI60N  

2.87”

NP4A/NP4AM 2.87”
180-105 LB  

2.87”

MPAF 128/149 LB GR
MPAF 128/149 LB GR 234
MPAF 149 LB GR 234
MPAF GGR 118
MPAF RI 60 N
MPAF NP4AM
MPAF BA9101

TYPE OF 

RAIL

H

(inches)

RAIL SHOE

(Using DBG-LY clamp 

and 2” depth cutters)

40 LB ASCE 

3 1/16" 

60 LB ASCE 

3 1/16" 

80 LB ASCE  

2 3/16”

85 LB ASCE  

2 17/64”

85 LB PRR  

2 1/16”

85 LB PS  

2 15/64”

90 LB ARA-A  

2 9/16”

90 LB ASCE  

2 45/128”

100 LB ARA-A  

2 3/4”

100 LB ARA-B  

2 65/128”

100 LB ASCE  

2 65/128”

100 LB DY  

2 5/8”

100 LB NYNH&H   2 39/64”
100 LB RE  

2 45/64”

100 LB RE-HF  

2 45/64”

100 LB PRR  

2 9/32”

100 LB PS  

2 31/64”

105 LB DY/110 LB RE  2 43/64”
112/115/119 LB RE  2 7/8”
122 CB  

2 7/8”

127 LB DY  

3 1/8”

130 LB RE/HF-A   2 3/4”
130 LB RE-HF 

3 1/16"

130 LB HF-B  

3 3/8”

130 LB PS 

2 3/4”

131 LB RE 

3 1/2”

132 LB RE  

3 3/32”

133 LB RE  

3”

136 LB RE  

3 3/32”

136 LB LE VAL  

3 1/16”

140 LB RE/140 PS   3”
141 LB AB/ 141 LB RE 3 3/32”
152 LB PS  

3 3/4”

155 LB PS rail 

3 3/8”

MPAF 40 LB ASCE
MPAF 60 LB ASCE 
MPAF 80 LB ASCE
MPAF 85 LB ASCE
MPAF 85 LB PRR
MPAF 85 LB PS
MPAF 90 LB ARA-A
MPAF 90 LB ASCE
MPAF 100 LB ARA-A
MPAF 100 LB ARA-B
MPAF 100 LB ASCE
MPAF 100 LB DY
MPAF 100 LB NH
MPAF 100 LB RE
MPAF 100 LB RE-HF
MPAF 100 LB PRR
MPAF 100 LB PS
MPAF 105 LB DY
MPAF 115/119 LB RE
MPAF 122 CB
MPAF 127 LB DYM
MPAF 130 LB RE
MPAF 130 LB RE-HF
MPAF 130 LB HF-B
MPAF 130 LB PS
MPAF 131 LB RE
MPAF 132 LB RE
MPAF 133 LB RE
MPAF 136 LB RE
MPAF 136 LB LVM
MPAF 140 LB RE
MPAF 141 LB AB
MPAF 152 LB PS  *
MPAF 155 LB PS  *

TYPE OF 

RAIL

H

(inches)

RAIL 

SHOE

In the case of a breakdown contact our Area Agent who will advise you on the problem 
and give you the necessary instructions on how to dispatch the tool to our nearest service 
Centre
; if possible, attach a copy of the Test Cerifi cate supplied by

 Cembre 

together with 

the tool or, if no other references are available, indicate the approximate purchase date 
and the tool serial number.

29

15. RETURN TO 

Cembre

 

FOR OVERHAUL

Summary of Contents for LD-2ENY

Page 1: ...nce T l 01 60 49 11 90 Fax 01 60 49 29 10 B P 37 91421 Morangis C dex E mail info cembre fr www cembre fr Cembre Espa a S L Calle Verano 6 y 8 P I Las Monjas 28850 Torrej n de Ardoz Madrid Espa a Tel...

Page 2: ...neral characteristics 2 2 Accessories supplied with the rail drill 3 3 Optional accessories to be ordered separately 4 4 Type SR5000 coolant unit 10 5 Spindle advancing lever 12 6 Preparing the rail d...

Page 3: ...e page 28 RAIL DRILL TYPE LD 2ENY NOTES ATTENTION Before using the rail drilling carefully read the instructions contained in this manual SAVE THESE INSTRUCTIONS this manual contains important safety...

Page 4: ...ving the drilling swarf 2 8 4 7 fl oz 140 ml oil tank for the gear reduction 2 9 Type SR5000 coolant unit Accessories from pos 2 1 to pos 2 8 are included in the Kit of accessories for LD 2ENYY having...

Page 5: ...ings complete with the TDB 6 termination Always supplied with rail drill ref LD 2EY 3 1 2 DBG GR device for clamping the rail drill in correspondance of guard rail complete with theTDB 1 termination A...

Page 6: ...4 H FIG 27 DBG Y RAIL WEB CLAMPING DEVICE 6001154 6700524 6040421 6001155 6001156 6760378 6340612 6900314 6650144 6900348 6760222 6140082 6001775 6001751 6001756 6001754 6340160 6380310 6001150 60016...

Page 7: ...64 100 LB RE 2 45 64 100 LB RE HF 2 45 64 100 LB PRR 2 9 32 100 LB PS 2 31 64 105 LB DY 110 LB RE 2 43 64 112 115 119 LB RE 2 7 8 122 CB 2 7 8 127 LB DY 3 1 8 130 LB RE HF A 2 3 4 130 LB RE HF 3 1 16...

Page 8: ...WA is equal to 96 6 dB A Protection of operators against risksof exposure to noise during work Cembre drills type LD 2EY are designed and constructed according to EEC directives 80 1107 and 86 188 rel...

Page 9: ...y of the drill clamp and correct assembly of the cutter bit Suitable lubrocooling lubrication cooling to keep the temperature of the tool low so as not to compromise the efficiency of the cutting edge...

Page 10: ...3 8 Y included in the APED 130 included in the APED 135 165 DPE DPE included in the APED 130 DPE DPE DPE DPE DPE not required not required not required not required not required not required TST50 DB...

Page 11: ...screw it back in the appropriate housing FIG 24 REMOVAL OF METALLIC RESIDUE 21 13 MAINTENANCE The type SR5000 coolant unit consists of a tank complete with tube and maximum pressure valve 01 fitted w...

Page 12: ...manual external cooling when cutters are used to enlarge existing holes or when using spiral bits not de signed for automatic cooling If necessary the ARE adaptor can also be used to clean various par...

Page 13: ...th the release pawl 39 pressed the lever is releasedfromitshubandcanrepeattheprevious travel without the spindle moving 11 STORING THE RAIL DRILL When work has been completed store the drill by procee...

Page 14: ...rovided to insert the spiral bit if necessary rotate the spindle shaft manually and sufficiently by inserting the 4 mm male hexagon key in the appropriate intermediate gear housing in the crankcase of...

Page 15: ...l then switched off after drilling by closing the tap FIG 20a COOLING DRILLING WITH SPIRAL BIT use only for APE do not required for APED 6 2 2 Insert into the spindle shaft the DPE spacer required to...

Page 16: ...dfinallyrelievingthepressurein the exit phase When drilling close to raised markings on the rail the initial pressure must be extremely light until the markings disappear otherwise the cutter may be d...

Page 17: ...drill fitted with short type broach cutter depth of cut 7 8 The drilling sequence may be started with the drill fitted with the broach cutter 6 1 positioning shoe 7 3 the drill being clamped to the r...

Page 18: ...n the element to be drilled To position the drilling machine complete with the clamping termination 7 1 and the positioning template 7 3 suitable for the type of rail to be drilled proceed as follows...

Reviews: