20
Ver. 05-2015
ENGLISH
Use and maintenance manual
Maintenance
8.1
GENERAL
cAuTIoN
b
efoRe
peRfoRmING
ANy
mAINTeNANce
opeRATIoNs
,
mAke
suRe
The
mAchINe
hAs
beeN
dIscoNNecTed
fRom
The
mAINs
poWeR
supply
. A
lWAys
use
The
p
eRsoNAl
p
RoTecTIve
e
quIpmeNT
INdIcATed
IN
The
I
NsTAllATIoN
m
ANuAl
.
8.1.1 Introductory notes
This machine has been designed so as not to require rou-
tine maintenance, apart from accurate periodic cleaning.
It is important to keep the machine perfectly clean in or-
der to prevent dust or impurities from compromising the
operation of the balancer.
WARNING
T
he
people
RespoNsIble
foR
cleANING
The
AReA
WheRe
The
mAchINe
Is
INsTAlled
musT
WeAR
peRsoNAl
pRoTecTIve
equIp
-
meNT
IN
oRdeR
To
WoRk
IN
sAfeTy
ANd
AccoRdING
To
The
cuRReNT
occupATIoNAl
heATh
ANd
sAfeTy
ReGulATIoNs
. I
N
ANy
eveNT
,
The
mAINTeNANce
musT
be
cARRIed
ouT
exclusIvely
by
A
specIAlIsed
TechNIcIAN
TRAINed
To
opeRATe
AccoRdING
To
CEI EN
50110-1 (
NFPA
70
e
-2004
secTIoN
400.11).
As extraordinary maintenance must be performed by service
staff or, in any case, by specifically authorised and trained
people, is not dealt with in this manual.
8.1.2 Safety rules
Performing specialist activities on the equipment, particularly
if the guards need to be dismounted, exposes people to
serious danger due to the presence of potentially live parts.
The rules shown below must be scrupulously followed.
People must always use the Personal Protective Equip-
ment indicated in the Installation Manual. During activi-
ties, unauthorised people may not access the equipment
and WORK IN PROGRESS signs will be erected in the
department in such a way that they are visible from every
place of access.
8. Maintenance
Specialist staff must be authorised and especially trained
concerning the dangers that may arise during operation
and the correct methods for avoiding them.
They must always work with great care and pay full at-
tention.
If, exceptionally, the staff removes the guards to carry out
a particular specialist technical maintenance, inspection
or repair job, they are required to put them back after
work.
After work, staff must make sure that foreign objects, in
particular mechanical pieces, tools or devices used dur-
ing the operative procedure that could cause damage or
malfunctions are not left inside the balancer.
For safety, before starting work, maintenance, inspection
and repair staff must disconnect all power sources and
take all the necessary preventive safety measures.
As well as operating frequencies, the operations described
below indicate the qualifications that staff must possess
in order to perform the operation.
8.1.3 Replacing fuses
Some protection fuses are located on the power board
(see wiring diagrams) accessible by dismantling the weight
shelf). If fuses require replacement, use ones with an
identical current intensity.