- 15 -
BACK POSITION FRONT POSITION MIDDLE POSITION
Fig. 10 ROTALOCK Valve Operation
BACK POSITION FRONT POSITION MIDDLE POSITION
Fig. 11 Base Valve Operation
1 - Process & Manometer; 2 – Receiver Discharge)/Compressor Suction
3 – Liquid Line/Suction Line; 4 - Pressure Control
3.
Use of the adjustable pressure control (if applicable for pump-down)
Suction pressure setting: Cut out=5 psig; Cut in=25 psig; Differential=20 psig
Head pressure setting: Cut out=230 psig; Cut in=150 psig; Differential=80 psig
It may need to adjust the setting in the field to get the right cycle time.
Summary of Contents for 1/2 Ton-DS
Page 21: ...20 Fig 16 CellarTec 1 3 Ton DS Electrical Wiring Diagram...
Page 22: ...21 Fig 17 CellarTec 1 2 Ton DS Electrical Wiring Diagram...
Page 23: ...22 Fig 18 CellarTec 3 4 Ton DS Wiring Diagram...
Page 24: ...23 Fig 19 Low Ambient Temperature CellarTec 1 3 Ton DS Electrical Wiring Diagram...
Page 25: ...24 Fig 20 Low Ambient Temperature CellarTec 1 2 Ton DS Electrical Wiring Diagram...
Page 26: ...25 Fig 21 Low Ambient Temperature CellarTec 3 4 Ton DS Wiring Diagram...